What's changing near NG21 0RE
Within 2 km, around Rainworth & Blidworth in Newark and Sherwood. Building, planning, schools, transport, prices and crime.
2new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.9%like-for-like prices in Rainworth & Blidworth, 2024 → 2025 (council +2.7%)
-6%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 33 m²
13since energy certificates began (2008)
1in NG21 0RE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
37hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
- Severn Trent Water
Blidworth - Dale Ln/Baulker Ln Spsinto Gw Via Infiltration System10 spills, 37 hours in 2025
1.5 km away - Severn Trent Water
Blidworth - Dale Ln/Baulker Ln Spsinto Groundwater Via Infiltration1 spills, 0 hours in 2025
1.5 km away - Severn Trent Water
Blidworth - Dale Lane-Park Ave Csointo Groundwater Via Infiltration0 spills, 0 hours in 2025
1.5 km away - Severn Trent Water
Blidworth Dale Ln-Lyndhurst Ave Csointo Groundwater Via Infiltration0 spills, 0 hours in 2025
1.5 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 12 running (110 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Linney Group, Adamsway - Solar PanelsApproved, not yet built · 200 kW
Jun 2023
4.2 km away - Rooftop solar
Crown Farm Way - Solar PhotovoltaicApproved, not yet built · 330 kW
Oct 2022
5.9 km away - Solar farm
Featherstone House FarmApproved, not yet built · 3 MW
Apr 2016
5.9 km away - Solar farm
Two Oaks Quarry, Coxmoor Road - Solar ArrayApproved, not yet built · 4 MW
Jan 2024
6.3 km away - Rooftop solar
The Samworth Church Academy, Sherwood Hall Road - Solar PanelsApproved, not yet built · 320 kW
Dec 2025
6.4 km away - Battery storage
Kestral Road - Battery Energy Storage FacilityApproved, not yet built
Dec 2023
7.4 km away - Rooftop solar
Sherwood Way SouthApproved, not yet built · 3 MW
Sept 2021
7.5 km away - Rooftop solar
Sutton Road - Solar PanelsApproved, not yet built · 410 kW
Mar 2022
8.2 km away - Battery storage
Mcdonalds, Mansfield Road - Micro Energy StoragePlanning application in · 200 kW
May 2026
8.6 km away - Rooftop solar
Hucknall Leisure Centre, Linby Road - Solar PanelsApproved, not yet built
Feb 2025
8.7 km away - Rooftop solar
Road and street works within 1 km
9 permitted works running now or planned, 7 of them major.
- Major
Grange Road, BlidworthWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
350 m away - Major, planned
Mansfield Road, BlidworthUtility asset works · CADENT GAS LIMITED · Multi-way signals
Nov 2026 to Nov 2026
450 m away - Major
Mansfield Road, BlidworthUtility asset works · CADENT GAS LIMITED · Multi-way signals
Nov 2026 to Nov 2026
500 m away - Major
Haywood Oaks Lane, BlidworthWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026
800 m away - Major
Dale Lane, BlidworthWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Aug 2026 to Oct 2026
850 m away - Major, planned
Warsop Lane, RainworthUtility asset works · CADENT GAS LIMITED · Two-way signals
Sept 2026 to Oct 2026
900 m away - Major
Warsop Lane, RainworthUtility asset works · CADENT GAS LIMITED · Two-way signals
Sept 2026 to Oct 2026
900 m away - Standard
Mansfield Road, BlidworthUtility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Nov 2026
600 m away - Minor
Dale Lane, BlidworthDisconnection or alteration of supply · National Grid Electricity Distribution (East Midlands) · No carriageway incursion
Nov 2026 to Nov 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decisionapplication due July 2025
15.5 km away - Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent decided Oct 2025
20.8 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
23.0 km away - Pre-application
H2East Pipeline: Humber to NottinghamshireGas Transporter Pipe-lines · Located between North Killingholme and Immingham on the Humber and extending to
Newark in Nottinghamshire, via Scunthorpe in North Lincolnshire, and High Marnham and Kirton in Nottinghamshire application due December 2028
26.7 km away - Decided
One Earth Solar Farm Generating Stations · Land surrounding the River Trent, north of South Clifton, east of Skegby, west of Thorney. decided Jul 2026
27.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lindhurst Wind Farm (wind farm, 3.0 km); Inkersall Grange Farm (solar farm, 4.6 km); Bilsthorpe (Land off Forest Lane) (solar farm, 5.8 km); Burntstump Landfill Scheme (landfill gas, 6.3 km); Newstead and Annesley Wind Turbine (wind farm, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.