What's changing near NG20 9RD
Within 2 km, around Langwith, Shirebrook South & Pleasley in Bolsover. Building, planning, schools, transport, prices and crime.
41new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+6.6%like-for-like prices in Langwith, Shirebrook South & Pleasley, 2024 → 2025 (council +2.3%)
-14%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
3homes extended 2021–2025, typically adding 21 m²
6since energy certificates began (2008)
0in NG20 9RD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
83hours of spills in 2025 between them (typical neighbourhood: about 36)
40spill events counted
- Severn Trent Water
Langwith Csointo River Poulter39 spills, 82 hours in 2025
1.9 km away - Severn Trent Water
Shirebrook Sewerage System Csointo Trib Of River Meden1 spills, 0 hours in 2025
1.8 km away - Severn Trent Water
Whaley Thorns - Main Road/Limes Ave (So)into River Poulter0 spills, 0 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 18 running (134 MW between them). Those within 5 km are on the map above.
- Solar farm
Frithwood Farm, Frithwood Lane - Solar FarmApproved, not yet built · 25 MW
Dec 2023
3.3 km away - Solar farm
Brecks Solar FarmApproved, not yet built · 45 MW
Sept 2023
4.6 km away - Rooftop solar
Unit A, Concorde Way - Solar PanelsApproved, not yet built · 390 kW
Dec 2025
6.3 km away - Battery storage
Creswell Road, Clowne - Battery StorageApproved, not yet built · 200 kW
Mar 2025
7.2 km away - Battery storage
Commerce Park, Markham Lane - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
7.8 km away - Rooftop solar
Grangers International Enterprise Way - Solar PanelsApproved, not yet built · 250 kW
Aug 2025
8.2 km away - Rooftop solar
Lindrick Way, Barlborough - Solar PanelsApproved, not yet built · 1 MW
Feb 2024
8.3 km away - Rooftop solar
The Samworth Church Academy, Sherwood Hall Road - Solar PanelsApproved, not yet built · 320 kW
Dec 2025
8.4 km away - Battery storage
Seymour, Link Road - Micro Energy Storage ProjectApproved, not yet built · 200 kW
Nov 2025
8.6 km away - Rooftop solar
Holdsworth Cold Store, Duckmanton - Solar panelsApproved, not yet built · 230 kW
Sept 2023
8.6 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major
Albine Road, Langwith JunctionUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jun 2026 to Oct 2026
350 m away - Minor
Rectory Road, Upper LangwithUtility repair and maintenance works · SEVERN TRENT WATER · Multi-way signals
Oct 2026 to Oct 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
18.7 km away - Decisionapplication due July 2025
23.0 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
25.4 km away - Pre-application
H2East Pipeline: Humber to NottinghamshireGas Transporter Pipe-lines · Located between North Killingholme and Immingham on the Humber and extending to
Newark in Nottinghamshire, via Scunthorpe in North Lincolnshire, and High Marnham and Kirton in Nottinghamshire application due December 2028
29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: SPF Thirty Acres Farm (solar farm, 1.9 km); Land at Bolsover Moor Quarry (solar farm, 3.4 km); Littlewood Lane Solar (solar farm, 4.2 km); Creswell Solar Park (solar farm, 4.3 km); Hunciecroft Farm (solar farm, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.