What's changing near NG19 8NA
Within 2 km, around Manor, Hornby & Peafields in Mansfield. Building, planning, schools, transport, prices and crime.
11new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.2%like-for-like prices in Manor, Hornby & Peafields, 2024 → 2025 (council +2.6%)
+17%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedflats · Aug 2025
Aug 2025
700 m away - School closed
School closed: Saville House SchoolOther independent school, other independent school (closure)
Jan 2023
550 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
8homes extended 2021–2025, typically adding 25 m²
17since energy certificates began (2008)
1in NG19 8NA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
159hours of spills in 2025 between them (typical neighbourhood: about 36)
103spill events counted
- Severn Trent Water
Mansfield Woodhouse - Kingsley Ave (Cso)into The Bottoms, Trib Of River Meden15 spills, 57 hours in 2025
700 m away - Severn Trent Water
Mansf Woodhouse - Old Mill Ln (Cso)into River Maun32 spills, 39 hours in 2025
1.4 km away - Severn Trent Water
Mansfield Woodhouse-12 Wells Cl Csointo Leas Brook14 spills, 28 hours in 2025
550 m away - Severn Trent Water
Mansfield Woodhouse-Kingsley Av Spsinto Leas Brook4 spills, 11 hours in 2025
650 m away - Severn Trent Water
Maun Valley Sewage Pumping Stationinto River Maun7 spills, 8 hours in 2025
1.9 km away - Severn Trent Water
Mansfield Woodhouse - Leeming Lane (Cso)into The Leas Brook12 spills, 7 hours in 2025
600 m away - Severn Trent Water
Albert Square Csointo Leas Brook10 spills, 6 hours in 2025
600 m away - Severn Trent Water
Mansfield Woodhouse - Warsop Rd Csointo Leas Brook9 spills, 4 hours in 2025
550 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
18 planned, approved or being built and 15 running (151 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Unit A, Concorde Way - Solar PanelsApproved, not yet built · 390 kW
Dec 2025
2.1 km away - Rooftop solar
The Samworth Church Academy, Sherwood Hall Road - Solar PanelsApproved, not yet built · 320 kW
Dec 2025
2.8 km away - Rooftop solar
Crown Farm Way - Solar PhotovoltaicApproved, not yet built · 330 kW
Oct 2022
3.6 km away - Rooftop solar
Sutton Road - Solar PanelsApproved, not yet built · 410 kW
Mar 2022
4.4 km away - Battery storage
Kestral Road - Battery Energy Storage FacilityApproved, not yet built
Dec 2023
4.6 km away - Solar farm
Brecks Solar FarmApproved, not yet built · 45 MW
Sept 2023
4.7 km away - Rooftop solar
Linney Group, Adamsway - Solar PanelsApproved, not yet built · 200 kW
Jun 2023
5.0 km away - Rooftop solar
Sherwood Way SouthApproved, not yet built · 3 MW
Sept 2021
5.1 km away - Battery storage
Mcdonalds, Mansfield Road - Micro Energy StoragePlanning application in · 200 kW
May 2026
5.1 km away - Battery storage
Crabtree Lane, Skegby - Battery Energy StorageApproved, not yet built
Jun 2025
6.1 km away - Rooftop solar
Road and street works within 1 km
15 permitted works running now or planned, 7 of them major.
- Major, planned
Shakespeare Avenue, Mansfield WoodhouseUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
250 m away - Major
Shakespeare Avenue, Mansfield WoodhouseUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
250 m away - Major
Brookside Avenue, Mansfield WoodhouseWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Major, planned
Melbourne Street, Mansfield WoodhousePermanent reinstatement · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
550 m away - Major
Melbourne Street, Mansfield WoodhousePermanent reinstatement · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
550 m away - Major, planned
George Street, Mansfield WoodhouseUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
700 m away - Major
George Street, Mansfield WoodhouseUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
700 m away - Minor
Leeming Lane North, Mansfield WoodhouseUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026
700 m away - Minor
Leeming Lane South, Mansfield WoodhouseUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026
700 m away
Major infrastructure projects within 30 km
- Decisionapplication due July 2025
19.9 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
22.6 km away - Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
24.4 km away - Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent decided Oct 2025
27.3 km away - Pre-application
H2East Pipeline: Humber to NottinghamshireGas Transporter Pipe-lines · Located between North Killingholme and Immingham on the Humber and extending to
Newark in Nottinghamshire, via Scunthorpe in North Lincolnshire, and High Marnham and Kirton in Nottinghamshire application due December 2028
28.7 km away - Decided
One Earth Solar Farm Generating Stations · Land surrounding the River Trent, north of South Clifton, east of Skegby, west of Thorney.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Littlewood Lane Solar (solar farm, 1.6 km); Land At Debdale Lane (solar farm, 1.9 km); SPF Thirty Acres Farm (solar farm, 4.1 km); Lindhurst Wind Farm (wind farm, 6.4 km); Welbeck Colliery (solar farm, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.