Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
35hours of spills in 2025 between them (typical neighbourhood: about 36)
36spill events counted
Severn Trent Water
Mansfield - 10 Randol Close Csointo River Maun16 spills, 24 hours in 2025
1.3 km away
Severn Trent Water
Sutton-In-Ashfield Stwinto River Maun\Kingsmill Reservoir2 spills, 8 hours in 2025
1.3 km away
Severn Trent Water
Mansfield - Sheepbridge Lane 2 Csointo River Maun17 spills, 2 hours in 2025
600 m away
Severn Trent Water
Mansfield - Sheepbridge Lane 2 Csointo River Maun1 spills, 0 hours in 2025
20 planned, approved or being built and 11 running (96 MW between them). Those within 5 km are on the map above.
Battery storage
Kestral Road - Battery Energy Storage FacilityApproved, not yet built
Dec 2023 1.1 km away
Rooftop solar
Sutton Road - Solar PanelsApproved, not yet built · 410 kW
Mar 2022 1.2 km away
Rooftop solar
Sherwood Way SouthApproved, not yet built · 3 MW
Sept 2021 1.6 km away
Battery storage
Mcdonalds, Mansfield Road - Micro Energy StoragePlanning application in · 200 kW
May 2026 2.0 km away
Rooftop solar
Unit A, Concorde Way - Solar PanelsApproved, not yet built · 390 kW
Dec 2025 2.5 km away
Rooftop solar
The Samworth Church Academy, Sherwood Hall Road - Solar PanelsApproved, not yet built · 320 kW
Dec 2025 2.6 km away
Rooftop solar
Linney Group, Adamsway - Solar PanelsApproved, not yet built · 200 kW
Jun 2023 3.5 km away
Rooftop solar
Romo, Oddicroft Lane - Solar PanelsApproved, not yet built · 1 MW
May 2024 3.6 km away
Rooftop solar
Lamtek Limited, Wolsey Drive - Solar PanelsApproved, not yet built · 810 kW
Sept 2025 4.0 km away
Rooftop solar
Lammas Leisure Centre, Lammas Road - Solar PanelsApproved, not yet built · 190 kW
Jan 2025 4.2 km away
Rooftop solar
Road and street works within 1 km
14 permitted works running now or planned, 13 of them major.
Major, planned
Spencer Street, MansfieldUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027 350 m away
Major
Spencer Street, MansfieldUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027 350 m away
Major, planned
Chaucer Street, MansfieldUtility asset works · CADENT GAS LIMITED · Give and take
Dec 2026 to Dec 2026 600 m away
Major
Layton Burroughs, MansfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026 650 m away
Major
Layton Avenue, MansfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026 650 m away
Major, planned
Hermitage Lane, MansfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · No carriageway incursion
Oct 2026 to Dec 2026 900 m away
Major
Hermitage Lane, MansfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · No carriageway incursion
Oct 2026 to Dec 2026 900 m away
Major
Ladybrook Lane, MansfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Dec 2026 950 m away
Major
Ladybrook Lane, MansfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Dec 2026 950 m away
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 27.4 km away
Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
decided Oct 2025 27.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Mansfield Town Centre & Broomhill: +28% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): -2.5% in two years.