What's changing near NG18 4US
Within 2 km, around King's Walk, Berry Hill & Oakham in Mansfield. Building, planning, schools, transport, prices and crime.
154new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.4%like-for-like prices in King's Walk, Berry Hill & Oakham, 2024 → 2025 (council +2.6%)
+16%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
33 new homes completed2 flats, 31 houses · May 2026 – Oct 2026
planned Oct 2026
1.8 km away - New homes
21 new homes completed2 flats, 19 houses · May 2026 – Sep 2026
Sept 2026
1.8 km away - New homes
5 new homes completedflats · Aug 2025 – Sep 2026
Sept 2026
1.8 km away - New homes
23 new homes completed2 flats, 21 houses · Nov 2024 – Aug 2026
Aug 2026
1.1 km away - New homes
5 new homes completedhouses · Apr 2025 – Aug 2026
Aug 2026
550 m away - New homes
13 new homes completedhouses · Jul 2026
Jul 2026
1.5 km away - New homes
15 new homes completedhouses · Nov 2024 – Jul 2026
Jul 2026
1.9 km away - New homes
7 new homes completedhouses · Mar 2025 – Feb 2026
Feb 2026
1.8 km away - New homes
8 new homes completedhouses · Dec 2024 – Sep 2025
Sept 2025
1.8 km away - New homes
5 new homes completedflats · Jul 2025
Jul 2025
1.7 km away - New homes
9 new homes completedhouses · May 2025
May 2025
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
21homes extended 2021–2025, typically adding 23 m²
34since energy certificates began (2008)
7in NG18 4US itself
- Extendedcertificate 2025
- Extendedcertificate 2025
- Extendedcertificate 2024
- Extendedcertificate 2022
- Extendedcertificate 2021
- Extended
Storm overflows within 2 km
2storm overflows within 2 km
238hours of spills in 2025 between them (typical neighbourhood: about 36)
55spill events counted
- Severn Trent Water
Mansfield - Bath Lane Stwinto River Maun31 spills, 157 hours in 2025
1.9 km away - Severn Trent Water
Sewage Pumping Stationinto River Maun24 spills, 81 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
17 planned, approved or being built and 11 running (102 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Linney Group, Adamsway - Solar PanelsApproved, not yet built · 200 kW
Jun 2023
1.3 km away - Rooftop solar
The Samworth Church Academy, Sherwood Hall Road - Solar PanelsApproved, not yet built · 320 kW
Dec 2025
1.6 km away - Rooftop solar
Crown Farm Way - Solar PhotovoltaicApproved, not yet built · 330 kW
Oct 2022
2.6 km away - Battery storage
Kestral Road - Battery Energy Storage FacilityApproved, not yet built
Dec 2023
2.7 km away - Rooftop solar
Sherwood Way SouthApproved, not yet built · 3 MW
Sept 2021
3.1 km away - Rooftop solar
Sutton Road - Solar PanelsApproved, not yet built · 410 kW
Mar 2022
3.3 km away - Battery storage
Mcdonalds, Mansfield Road - Micro Energy StoragePlanning application in · 200 kW
May 2026
4.0 km away - Rooftop solar
Unit A, Concorde Way - Solar PanelsApproved, not yet built · 390 kW
Dec 2025
4.2 km away - Solar farm
Two Oaks Quarry, Coxmoor Road - Solar ArrayApproved, not yet built · 4 MW
Jan 2024
4.8 km away - Rooftop solar
Romo, Oddicroft Lane - Solar PanelsApproved, not yet built · 1 MW
May 2024
5.2 km away - Rooftop solar
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major
Southwell Road West, MansfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026
400 m away - Minor
Southwell Road West, MansfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026
700 m away - Immediate - emergency
Berry Hill Road, MansfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Two-way signals
Jul 2026 to Oct 2026
750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decisionapplication due July 2025
18.7 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
21.0 km away - Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent decided Oct 2025
25.2 km away - Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
28.5 km away - Pre-application
H2East Pipeline: Humber to NottinghamshireGas Transporter Pipe-lines · Located between North Killingholme and Immingham on the Humber and extending to
Newark in Nottinghamshire, via Scunthorpe in North Lincolnshire, and High Marnham and Kirton in Nottinghamshire application due December 2028
28.7 km away - Decided
One Earth Solar Farm Generating Stations · Land surrounding the River Trent, north of South Clifton, east of Skegby, west of Thorney.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Running nearest: Lindhurst Wind Farm (wind farm, 2.4 km); Land At Debdale Lane (solar farm, 4.0 km); Littlewood Lane Solar (solar farm, 5.6 km); Newstead and Annesley Wind Turbine (wind farm, 7.1 km); Sutton Landfill Site (landfill gas, 7.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.