20 planned, approved or being built and 9 running (93 MW between them). Those within 5 km are on the map above.
Battery storage
Kestral Road - Battery Energy Storage FacilityApproved, not yet built
Dec 2023 1.4 km away
Rooftop solar
Sherwood Way SouthApproved, not yet built · 3 MW
Sept 2021 1.8 km away
Rooftop solar
Sutton Road - Solar PanelsApproved, not yet built · 410 kW
Mar 2022 2.0 km away
Rooftop solar
The Samworth Church Academy, Sherwood Hall Road - Solar PanelsApproved, not yet built · 320 kW
Dec 2025 2.2 km away
Rooftop solar
Linney Group, Adamsway - Solar PanelsApproved, not yet built · 200 kW
Jun 2023 2.5 km away
Battery storage
Mcdonalds, Mansfield Road - Micro Energy StoragePlanning application in · 200 kW
May 2026 2.6 km away
Rooftop solar
Unit A, Concorde Way - Solar PanelsApproved, not yet built · 390 kW
Dec 2025 3.4 km away
Rooftop solar
Crown Farm Way - Solar PhotovoltaicApproved, not yet built · 330 kW
Oct 2022 3.7 km away
Rooftop solar
Romo, Oddicroft Lane - Solar PanelsApproved, not yet built · 1 MW
May 2024 3.9 km away
Rooftop solar
Lamtek Limited, Wolsey Drive - Solar PanelsApproved, not yet built · 810 kW
Sept 2025 4.1 km away
Solar farm
Road and street works within 1 km
5 permitted works running now or planned, 4 of them major.
Major, planned
Delamere Close, MansfieldUtility asset works · SEVERN TRENT WATER · Road closure
Nov 2026 to Dec 2026 350 m away
Major
Delamere Close, MansfieldUtility asset works · SEVERN TRENT WATER · Road closure
Nov 2026 to Dec 2026 350 m away
Major, planned
Brunt Street, MansfieldNew service connection · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026 900 m away
Major
Brunt Street, MansfieldNew service connection · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026 900 m away
Immediate - emergency
Berry Hill Road, MansfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Two-way signals
Jul 2026 to Oct 2026 550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
decided Oct 2025 26.5 km away
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 28.2 km away
Pre-application
H2East Pipeline: Humber to NottinghamshireGas Transporter Pipe-lines · Located between North Killingholme and Immingham on the Humber and extending to
Newark in Nottinghamshire, via Scunthorpe in North Lincolnshire, and High Marnham and Kirton in Nottinghamshire
application due December 2028 30.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in King's Walk, Berry Hill & Oakham: +27% over five years (2020 → 2025).
Council tax list: 60 homes added in the neighbourhood since April 2024.
Population (GP registrations): +1.8% in two years.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Two Oaks Quarry, Coxmoor Road - Solar ArrayApproved, not yet built · 4 MW
Jan 2024 4.3 km away
Rooftop solar
Lammas Leisure Centre, Lammas Road - Solar PanelsApproved, not yet built · 190 kW
Jan 2025 4.8 km away
Running nearest: Land At Debdale Lane (solar farm, 3.3 km); Lindhurst Wind Farm (wind farm, 3.4 km); Littlewood Lane Solar (solar farm, 5.3 km); Sutton Landfill Site (landfill gas, 5.8 km); Newstead and Annesley Wind Turbine (wind farm, 6.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.