Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
457hours of spills in 2025 between them (typical neighbourhood: about 36)
108spill events counted
Severn Trent Water
Kirkby In Ashfield Sewage Treatmentinto River Erewash45 spills, 306 hours in 2025
900 m away
Severn Trent Water
Kirkby In Ashfield Sewage Treatmentinto River Erewash29 spills, 88 hours in 2025
850 m away
Severn Trent Water
Kirkby In Ashfield - Mill Lane (Cso)into River Erewash12 spills, 29 hours in 2025
550 m away
Severn Trent Water
Kirkby-In-Ashfield - Lane End Csointo River Erewash13 spills, 20 hours in 2025
1.9 km away
Severn Trent Water
Regent Street Csointo River Erewash5 spills, 9 hours in 2025
1.4 km away
Severn Trent Water
Annesley Woodhouse- Forest Rd A Csointo Tributary Of River Erewash4 spills, 6 hours in 2025
1.8 km away
Severn Trent Water
Kirkby-In-Ashfield - Lindley’S Lane (Sso)into River Erewash0 spills, 0 hours in 2025
39 planned, approved or being built and 7 running (37 MW between them). Those within 5 km are on the map above.
Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024 3.0 km away
Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 3.1 km away
Rooftop solar
Lamtek Limited, Wolsey Drive - Solar PanelsApproved, not yet built · 810 kW
Sept 2025 3.3 km away
Rooftop solar
Romo, Oddicroft Lane - Solar PanelsApproved, not yet built · 1 MW
May 2024 3.9 km away
Solar farm
Two Oaks Quarry, Coxmoor Road - Solar ArrayApproved, not yet built · 4 MW
Jan 2024 4.0 km away
Rooftop solar
Brookside Way, Huthwaite - Solar PhotovoltaicsApproved, not yet built · 300 kW
May 2024 4.5 km away
Rooftop solar
Lammas Leisure Centre, Lammas Road - Solar PanelsApproved, not yet built · 190 kW
Jan 2025 4.6 km away
Rooftop solar
Eurocell Nickel, High View Road - Solar Pv SystemPlanning application in · 600 kW
Jul 2024 4.7 km away
Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024 5.3 km away
Battery storage
Mcdonalds, Mansfield Road - Micro Energy StoragePlanning application in · 200 kW
May 2026 5.7 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 29.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Annesley & Kirkby Woodhouse: +36% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.2% in two years.