What's changing near NG17 8QH
Within 2 km, around Kirkby Larwood & Kingsway in Ashfield. Building, planning, schools, transport, prices and crime.
36new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.9%like-for-like prices in Kirkby Larwood & Kingsway, 2024 → 2025 (council +3.0%)
+40%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 28 m²
25since energy certificates began (2008)
3in NG17 8QH itself
- Extendedcertificate 2025
- Extendedcertificate 2015
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
451hours of spills in 2025 between them (typical neighbourhood: about 36)
104spill events counted
- Severn Trent Water
Kirkby In Ashfield Sewage Treatmentinto River Erewash45 spills, 306 hours in 2025
1.6 km away - Severn Trent Water
Kirkby In Ashfield Sewage Treatmentinto River Erewash29 spills, 88 hours in 2025
1.6 km away - Severn Trent Water
Kirkby In Ashfield - Mill Lane (Cso)into River Erewash12 spills, 29 hours in 2025
1.4 km away - Severn Trent Water
Kirkby-In-Ashfield - Lane End Csointo River Erewash13 spills, 20 hours in 2025
1.1 km away - Severn Trent Water
Regent Street Csointo River Erewash5 spills, 9 hours in 2025
950 m away - Severn Trent Water
Kirkby-In-Ashfield - Lindley’S Lane (Sso)into River Erewash0 spills, 0 hours in 2025
1.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
32 planned, approved or being built and 10 running (54 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Lamtek Limited, Wolsey Drive - Solar PanelsApproved, not yet built · 810 kW
Sept 2025
1.9 km away - Rooftop solar
Romo, Oddicroft Lane - Solar PanelsApproved, not yet built · 1 MW
May 2024
2.2 km away - Rooftop solar
Lammas Leisure Centre, Lammas Road - Solar PanelsApproved, not yet built · 190 kW
Jan 2025
2.7 km away - Rooftop solar
Brookside Way, Huthwaite - Solar PhotovoltaicsApproved, not yet built · 300 kW
May 2024
3.1 km away - Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026
3.2 km away - Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024
3.3 km away - Rooftop solar
Eurocell Nickel, High View Road - Solar Pv SystemPlanning application in · 600 kW
Jul 2024
3.9 km away - Solar farm
Two Oaks Quarry, Coxmoor Road - Solar ArrayApproved, not yet built · 4 MW
Jan 2024
3.9 km away - Battery storage
Mcdonalds, Mansfield Road - Micro Energy StoragePlanning application in · 200 kW
May 2026
4.0 km away - Rooftop solar
Sherwood Way SouthApproved, not yet built · 3 MW
Sept 2021
4.3 km away
Road and street works within 1 km
7 permitted works running now or planned, 6 of them major.
- Major
Frederick Avenue, Kirkby In AshfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
650 m away - Major
Ash Crescent, Kirkby In AshfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
650 m away - Major
Shelford Avenue, Kirkby In AshfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
700 m away - Major
Cherry Avenue, Kirkby In AshfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
750 m away - Major
Langton Avenue, Kirkby In AshfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
750 m away - Major
Yew Tree Avenue, Kirkby In AshfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
950 m away - Minor
Church Hill, Kirkby In AshfieldNew service connection · VIRGIN MEDIA · Two-way signals
Oct 2026 to Nov 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
13.9 km away - Decideddecided Aug 2023
24.3 km away - Decisionapplication due July 2025
25.3 km away - Decideddecided Jan 2016
29.1 km away - RecommendationSept 2026
29.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Crow Trees Farm (solar farm, 2.2 km); Sutton Landfill Site (landfill gas, 2.9 km); Twin Yards Solar Farm (solar farm, 4.0 km); Newstead and Annesley Wind Turbine (wind farm, 4.4 km); Land At Debdale Lane (solar farm, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.