Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
451hours of spills in 2025 between them (typical neighbourhood: about 36)
104spill events counted
Severn Trent Water
Kirkby In Ashfield Sewage Treatmentinto River Erewash45 spills, 306 hours in 2025
1.8 km away
Severn Trent Water
Kirkby In Ashfield Sewage Treatmentinto River Erewash29 spills, 88 hours in 2025
1.8 km away
Severn Trent Water
Kirkby In Ashfield - Mill Lane (Cso)into River Erewash12 spills, 29 hours in 2025
1.5 km away
Severn Trent Water
Kirkby-In-Ashfield - Lane End Csointo River Erewash13 spills, 20 hours in 2025
650 m away
Severn Trent Water
Regent Street Csointo River Erewash5 spills, 9 hours in 2025
650 m away
Severn Trent Water
Kirkby-In-Ashfield - Lindley’S Lane (Sso)into River Erewash0 spills, 0 hours in 2025
31 planned, approved or being built and 9 running (49 MW between them). Those within 5 km are on the map above.
Rooftop solar
Lamtek Limited, Wolsey Drive - Solar PanelsApproved, not yet built · 810 kW
Sept 2025 1.5 km away
Rooftop solar
Romo, Oddicroft Lane - Solar PanelsApproved, not yet built · 1 MW
May 2024 2.0 km away
Rooftop solar
Lammas Leisure Centre, Lammas Road - Solar PanelsApproved, not yet built · 190 kW
Jan 2025 2.8 km away
Solar farm
Two Oaks Quarry, Coxmoor Road - Solar ArrayApproved, not yet built · 4 MW
Jan 2024 3.4 km away
Rooftop solar
Brookside Way, Huthwaite - Solar PhotovoltaicsApproved, not yet built · 300 kW
May 2024 3.5 km away
Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 3.7 km away
Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024 3.7 km away
Battery storage
Mcdonalds, Mansfield Road - Micro Energy StoragePlanning application in · 200 kW
May 2026 3.8 km away
Rooftop solar
Sherwood Way SouthApproved, not yet built · 3 MW
Sept 2021 4.0 km away
Rooftop solar
Eurocell Nickel, High View Road - Solar Pv SystemPlanning application in · 600 kW
Jul 2024 4.3 km away
Road and street works within 1 km
4 permitted works running now or planned, 3 of them major.
Major
Yew Tree Avenue, Kirkby In AshfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026 600 m away
Major
Hawthorn Crescent, Kirkby In AshfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026 700 m away
Major
Frederick Avenue, Kirkby In AshfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026 950 m away
Minor
Church Hill, Kirkby In AshfieldNew service connection · VIRGIN MEDIA · Two-way signals
Oct 2026 to Nov 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Kirkby Central: +24% over five years (2020 → 2025).
Council tax list: 50 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.3% in two years.