Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
481hours of spills in 2025 between them (typical neighbourhood: about 36)
106spill events counted
Severn Trent Water
Sutton-In-Ashfield Inlet Sps No 2into The Kingsmill Reservoir56 spills, 367 hours in 2025
1.5 km away
Severn Trent Water
Coxmoor Road Sewage Pumping Stationinto River Maun20 spills, 64 hours in 2025
1.2 km away
Severn Trent Water
Peel Street Combined Sewer Overflowinto Trib Of River Maun18 spills, 49 hours in 2025
450 m away
Severn Trent Water
Kirkby Folly Road Roundhill Csointo Tributary Of River Maun6 spills, 1 hours in 2025
1.3 km away
Severn Trent Water
Sheepwash Lane Csointo River Maun3 spills, 1 hours in 2025
900 m away
Severn Trent Water
Kirkby Folly Road Roundhill Csointo Tributary Of River Maun3 spills, 1 hours in 2025
1.3 km away
Severn Trent Water
Low St/Market Street Csointo River Maun (Idle)0 spills, 0 hours in 2025
450 m away
Severn Trent Water
Coxmoor Road Csointo River Maun0 spills, 0 hours in 2025
29 planned, approved or being built and 13 running (61 MW between them). Those within 5 km are on the map above.
Rooftop solar
Lammas Leisure Centre, Lammas Road - Solar PanelsApproved, not yet built · 190 kW
Jan 2025 750 m away
Rooftop solar
Romo, Oddicroft Lane - Solar PanelsApproved, not yet built · 1 MW
May 2024 900 m away
Rooftop solar
Lamtek Limited, Wolsey Drive - Solar PanelsApproved, not yet built · 810 kW
Sept 2025 1.6 km away
Battery storage
Mcdonalds, Mansfield Road - Micro Energy StoragePlanning application in · 200 kW
May 2026 1.7 km away
Battery storage
Crabtree Lane, Skegby - Battery Energy StorageApproved, not yet built
Jun 2025 2.3 km away
Rooftop solar
Sherwood Way SouthApproved, not yet built · 3 MW
Sept 2021 2.4 km away
Rooftop solar
Sutton Road - Solar PanelsApproved, not yet built · 410 kW
Mar 2022 2.4 km away
Battery storage
Kestral Road - Battery Energy Storage FacilityApproved, not yet built
Dec 2023 2.8 km away
Rooftop solar
Brookside Way, Huthwaite - Solar PhotovoltaicsApproved, not yet built · 300 kW
May 2024 3.3 km away
Solar farm
Two Oaks Quarry, Coxmoor Road - Solar ArrayApproved, not yet built · 4 MW
Jan 2024 4.4 km away
Battery storage
Road and street works within 1 km
5 permitted works running now or planned, 1 of them major.
Major
Lucknow Drive, Sutton In AshfieldUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026 950 m away
Standard
Footpath From High Pavement To New Street, Sutton In AshfieldUtility asset works · National Grid Electricity Distribution (East Midlands) · No carriageway incursion
Oct 2026 to Oct 2026 400 m away
Standard
Station Road, Sutton In AshfieldNew service connection · National Grid Electricity Distribution (East Midlands) · Multi-way signals
Oct 2026 to Oct 2026 850 m away
Immediate - urgent
Forest Street, Sutton In AshfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · No carriageway incursion
Oct 2025 to Oct 2026 250 m away
Minor
Devonshire Square, Sutton In AshfieldUtility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 28.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Sutton Forest Side & New Cross: +33% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.