What's changing near NG17 3AR
Within 2 km, around The Dales & South Skegby in Ashfield. Building, planning, schools, transport, prices and crime.
291new homes completed within 2 km, last 2 years
8homes given permission on brownfield sites since 2021
+4.5%like-for-like prices in The Dales & South Skegby, 2024 → 2025 (council +3.0%)
+13%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
17 new homes completedhouses · Nov 2024 – Oct 2026
planned Oct 2026
600 m away - New homes
43 new homes completedhouses · May 2025 – Oct 2026
planned Oct 2026
1.0 km away - New homes
23 new homes completedhouses · Apr 2025 – Oct 2026
planned Oct 2026
1.0 km away - New homes
37 new homes completedhouses · Nov 2025 – Oct 2026
Oct 2026
550 m away - New homes
31 new homes completedhouses · Nov 2024 – Jun 2026
Jun 2026
1.2 km away - New homes
24 new homes completedhouses · Jul 2025 – Apr 2026
Apr 2026
800 m away - New homes
20 new homes completedhouses · Nov 2024 – Apr 2026
Apr 2026
750 m away - New homes
28 new homes completedhouses · Jan 2025 – Dec 2025
Dec 2025
650 m away - New homes
8 new homes completedhouses · Dec 2024 – Sep 2025
Sept 2025
1.2 km away - New homes
8 new homes completedhouses · May 2025
Jun 2025
600 m away - New homes
9 new homes completedhouses · Nov 2024 – Jan 2025
Jan 2025
650 m away - New homes
14 new homes completedhouses · Nov 2024 – Jan 2025
Jan 2025750 m away
10homes extended 2021–2025, typically adding 24 m²
17since energy certificates began (2008)
2in NG17 3AR itself
- Extendedcertificate 2021
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
14storm overflows within 2 km
881hours of spills in 2025 between them (typical neighbourhood: about 36)
205spill events counted
- Severn Trent Water
Sutton-In-Ashfield Inlet Sps No 2into The Kingsmill Reservoir56 spills, 367 hours in 2025
1.4 km away - Severn Trent Water
Skegby Sewage Treatment Worksinto Skegby Brook37 spills, 253 hours in 2025
1.3 km away - Severn Trent Water
Skegby Sewage Treatment Worksinto Skegby Brook38 spills, 114 hours in 2025
1.3 km away - Severn Trent Water
Coxmoor Road Sewage Pumping Stationinto River Maun20 spills, 64 hours in 2025
1.5 km away - Severn Trent Water
Peel Street Combined Sewer Overflowinto Trib Of River Maun18 spills, 49 hours in 2025
1.4 km away - Severn Trent Water
Mansfield - 10 Randol Close Csointo River Maun16 spills, 24 hours in 2025
1.8 km away - Severn Trent Water
Sutton-In-Ashfield Stwinto River Maun\Kingsmill Reservoir2 spills, 8 hours in 2025
1.8 km away - Severn Trent Water
Kirkby Folly Road Roundhill Csointo Tributary Of River Maun6 spills, 1 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
31 planned, approved or being built and 13 running (61 MW between them). Those within 5 km are on the map above.
- Battery storage
Mcdonalds, Mansfield Road - Micro Energy StoragePlanning application in · 200 kW
May 2026
1.2 km away - Battery storage
Crabtree Lane, Skegby - Battery Energy StorageApproved, not yet built
Jun 2025
1.5 km away - Rooftop solar
Sutton Road - Solar PanelsApproved, not yet built · 410 kW
Mar 2022
1.7 km away - Rooftop solar
Lammas Leisure Centre, Lammas Road - Solar PanelsApproved, not yet built · 190 kW
Jan 2025
1.8 km away - Rooftop solar
Sherwood Way SouthApproved, not yet built · 3 MW
Sept 2021
2.3 km away - Rooftop solar
Romo, Oddicroft Lane - Solar PanelsApproved, not yet built · 1 MW
May 2024
2.3 km away - Battery storage
Kestral Road - Battery Energy Storage FacilityApproved, not yet built
Dec 2023
2.4 km away - Rooftop solar
Lamtek Limited, Wolsey Drive - Solar PanelsApproved, not yet built · 810 kW
Sept 2025
3.0 km away - Rooftop solar
Unit A, Concorde Way - Solar PanelsApproved, not yet built · 390 kW
Dec 2025
3.2 km away - Rooftop solar
Brookside Way, Huthwaite - Solar PhotovoltaicsApproved, not yet built · 300 kW
May 2024
4.3 km away - Battery storage
Road and street works within 1 km
4 permitted works running now or planned, 4 of them major.
- Major, planned
Omberley Avenue, Sutton In AshfieldUtility asset works · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Nov 2026
300 m away - Major
Omberley Avenue, Sutton In AshfieldUtility asset works · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Nov 2026
300 m away - Major, planned
Dalestorth Street, Sutton In AshfieldUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
500 m away - Major, planned
Back Lane, Sutton In AshfieldUtility asset works · ENERGY ASSETS PIPELINES LTD · Road closure
Dec 2026 to Dec 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
17.4 km away - Decisionapplication due July 2025
23.6 km away - Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
27.2 km away - Decideddecided Aug 2023
28.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Sutton Landfill Site (landfill gas, 2.6 km); Land At Debdale Lane (solar farm, 3.3 km); Crow Trees Farm (solar farm, 4.8 km); Twin Yards Solar Farm (solar farm, 5.3 km); Littlewood Lane Solar (solar farm, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.