Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
1,125hours of spills in 2025 between them (typical neighbourhood: about 36)
110spill events counted
Severn Trent Water
Pinxton Sewage Treatment Worksinto River Erewash67 spills, 1,022 hours in 2025
1.2 km away
Severn Trent Water
Birchwood Lane Csointo Trib Of River Erewash23 spills, 59 hours in 2025
1.9 km away
Severn Trent Water
Pinxton - Station Road Spsinto River Erewash20 spills, 45 hours in 2025
39 planned, approved or being built and 8 running (32 MW between them). Those within 5 km are on the map above.
Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024 400 m away
Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 500 m away
Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024 2.0 km away
Rooftop solar
Eurocell Nickel, High View Road - Solar Pv SystemPlanning application in · 600 kW
Jul 2024 2.5 km away
Rooftop solar
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar PanelsApproved, not yet built · 270 kW
Sept 2023 2.7 km away
Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024 2.8 km away
Rooftop solar
Guilford Europe, Cotes Park Lane - Solar PanelsApproved, not yet built · 2 MW
Apr 2023 3.1 km away
Rooftop solar
Brookside Way, Huthwaite - Solar PhotovoltaicsApproved, not yet built · 300 kW
May 2024 3.5 km away
Solar farm
Meadow Lane Solar FarmBeing built · 20 MW
Mar 2023 4.4 km away
Rooftop solar
Alfreton Leisure Centre Car Park, Church Street - Solar PanelsApproved, not yet built · 390 kW
Sept 20235.1 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
Major, planned
Hawthorne Road, PinxtonHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Jan 2027 to Feb 2027 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Lammas Leisure Centre, Lammas Road - Solar PanelsApproved, not yet built · 190 kW
Jan 2025 5.5 km away
Rooftop solar
Lamtek Limited, Wolsey Drive - Solar PanelsApproved, not yet built · 810 kW
Sept 2025 5.5 km away
Running nearest: Crow Trees Farm (solar farm, 2.5 km); Twin Yards Solar Farm (solar farm, 3.5 km); Sutton Landfill Site (landfill gas, 4.9 km); Newstead and Annesley Wind Turbine (wind farm, 6.8 km); Padleywood Farm (solar farm, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Gas Transporter Pipe-lines · Near Burton on Trent
decided Dec 2014 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.