Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
439hours of spills in 2025 between them (typical neighbourhood: about 36)
94spill events counted
Severn Trent Water
Kirkby In Ashfield Sewage Treatmentinto River Erewash45 spills, 306 hours in 2025
1.7 km away
Severn Trent Water
Kirkby In Ashfield Sewage Treatmentinto River Erewash29 spills, 88 hours in 2025
1.7 km away
Severn Trent Water
Pinxton - Station Road Spsinto River Erewash20 spills, 45 hours in 2025
44 planned, approved or being built and 7 running (27 MW between them). Those within 5 km are on the map above.
Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024 1.5 km away
Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 1.8 km away
Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024 3.6 km away
Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024 3.7 km away
Rooftop solar
Eurocell Nickel, High View Road - Solar Pv SystemPlanning application in · 600 kW
Jul 2024 4.0 km away
Rooftop solar
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar PanelsApproved, not yet built · 270 kW
Sept 2023 4.4 km away
Rooftop solar
Brookside Way, Huthwaite - Solar PhotovoltaicsApproved, not yet built · 300 kW
May 2024 4.6 km away
Rooftop solar
Guilford Europe, Cotes Park Lane - Solar PanelsApproved, not yet built · 2 MW
Apr 2023 4.7 km away
Rooftop solar
Lamtek Limited, Wolsey Drive - Solar PanelsApproved, not yet built · 810 kW
Sept 2025 5.0 km away
Rooftop solar
Romo, Oddicroft Lane - Solar PanelsApproved, not yet built · 1 MW
May 20245.4 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Lammas Leisure Centre, Lammas Road - Solar PanelsApproved, not yet built · 190 kW
Jan 2025 5.7 km away
Solar farm
Two Oaks Quarry, Coxmoor Road - Solar ArrayApproved, not yet built · 4 MW
Jan 2024 6.0 km away
Running nearest: Crow Trees Farm (solar farm, 3.3 km); Twin Yards Solar Farm (solar farm, 4.8 km); Newstead and Annesley Wind Turbine (wind farm, 5.3 km); Sutton Landfill Site (landfill gas, 5.4 km); Newthorpe Wind Turbine (wind farm, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Gas Transporter Pipe-lines · Near Burton on Trent
decided Dec 2014 29.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.