Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
1,427hours of spills in 2025 between them (typical neighbourhood: about 36)
131spill events counted
Severn Trent Water
Pinxton Sewage Treatment Worksinto River Erewash67 spills, 1,022 hours in 2025
1.3 km away
Severn Trent Water
Pye Bridge Sewage Treatment Worksinto River Erewash44 spills, 360 hours in 2025
1.7 km away
Severn Trent Water
Pinxton - Station Road Spsinto River Erewash20 spills, 45 hours in 2025
43 planned, approved or being built and 8 running (32 MW between them). Those within 5 km are on the map above.
Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024 1.7 km away
Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 2.1 km away
Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024 2.2 km away
Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024 2.7 km away
Rooftop solar
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar PanelsApproved, not yet built · 270 kW
Sept 2023 3.3 km away
Rooftop solar
Guilford Europe, Cotes Park Lane - Solar PanelsApproved, not yet built · 2 MW
Apr 2023 3.5 km away
Rooftop solar
Eurocell Nickel, High View Road - Solar Pv SystemPlanning application in · 600 kW
Jul 2024 4.2 km away
Rooftop solar
Brookside Way, Huthwaite - Solar PhotovoltaicsApproved, not yet built · 300 kW
May 2024 5.2 km away
Solar farm
Swanwick CollieryPlanning application in · 1 MW
Jul 2015 5.3 km away
Solar farm
Meadow Lane Solar FarmBeing built · 20 MW
Mar 2023 5.4 km away
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
Major, planned
Lindley Street, SelstonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 200 m away
Major
Lindley Street, SelstonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 200 m away
Minor
Nottingham Road, SelstonNew service connection · National Grid Electricity Distribution (East Midlands) · Multi-way signals
Oct 2026 to Oct 2026 500 m away
Minor
Church Lane, SelstonUtility repair and maintenance works · National Grid Electricity Distribution (East Midlands) · Two-way signals
Oct 2026 to Oct 2026 600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Aldercar Infant & Nursery School, Godkin Drive - Solar PanelsApproved, not yet built · 380 kW
Mar 2026 5.5 km away
Rooftop solar
Alfreton Leisure Centre Car Park, Church Street - Solar PanelsApproved, not yet built · 390 kW
Sept 2023 5.7 km away
Running nearest: Crow Trees Farm (solar farm, 4.1 km); Twin Yards Solar Farm (solar farm, 5.1 km); Sutton Landfill Site (landfill gas, 6.4 km); Newstead and Annesley Wind Turbine (wind farm, 6.7 km); Newthorpe Wind Turbine (wind farm, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.