What's changing near NG16 6GD
Within 2 km, around Selston in Ashfield. Building, planning, schools, transport, prices and crime.
10new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.5%like-for-like prices in Selston, 2024 → 2025 (council +3.0%)
-18%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 45 m²
9since energy certificates began (2008)
1in NG16 6GD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
1,427hours of spills in 2025 between them (typical neighbourhood: about 36)
131spill events counted
- Severn Trent Water
Pinxton Sewage Treatment Worksinto River Erewash67 spills, 1,022 hours in 2025
1.4 km away - Severn Trent Water
Pye Bridge Sewage Treatment Worksinto River Erewash44 spills, 360 hours in 2025
1.9 km away - Severn Trent Water
Pinxton - Station Road Spsinto River Erewash20 spills, 45 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
43 planned, approved or being built and 8 running (32 MW between them). Those within 5 km are on the map above.
- Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024
1.6 km away - Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026
2.0 km away - Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024
2.4 km away - Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024
2.8 km away - Rooftop solar
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar PanelsApproved, not yet built · 270 kW
Sept 2023
3.4 km away - Rooftop solar
Guilford Europe, Cotes Park Lane - Solar PanelsApproved, not yet built · 2 MW
Apr 2023
3.6 km away - Rooftop solar
Eurocell Nickel, High View Road - Solar Pv SystemPlanning application in · 600 kW
Jul 2024
4.1 km away - Rooftop solar
Brookside Way, Huthwaite - Solar PhotovoltaicsApproved, not yet built · 300 kW
May 2024
5.1 km away - Solar farm
Meadow Lane Solar FarmBeing built · 20 MW
Mar 2023
5.5 km away - Solar farm
Swanwick CollieryPlanning application in · 1 MW
Jul 2015
5.5 km away
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major, planned
Lindley Street, SelstonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026
100 m away - Major
Lindley Street, SelstonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026
100 m away - Minor
Nottingham Road, SelstonNew service connection · National Grid Electricity Distribution (East Midlands) · Multi-way signals
Oct 2026 to Oct 2026
350 m away - Minor
Church Lane, SelstonUtility repair and maintenance works · National Grid Electricity Distribution (East Midlands) · Two-way signals
Oct 2026 to Oct 2026
500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
9.5 km away - Decideddecided Aug 2023
19.8 km away - Decideddecided Jan 2016
25.9 km away - RecommendationSept 2026
25.9 km away - RecommendationSept 2026
28.0 km away - Decideddecided Dec 2014
28.6 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Crow Trees Farm (solar farm, 3.9 km); Twin Yards Solar Farm (solar farm, 5.1 km); Sutton Landfill Site (landfill gas, 6.3 km); Newstead and Annesley Wind Turbine (wind farm, 6.6 km); Newthorpe Wind Turbine (wind farm, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.