Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
513hours of spills in 2025 between them (typical neighbourhood: about 36)
93spill events counted
Severn Trent Water
Pye Bridge Sewage Treatment Worksinto River Erewash44 spills, 360 hours in 2025
1.2 km away
Severn Trent Water
Ironville - Victoria Street Spsinto River Erewash25 spills, 81 hours in 2025
650 m away
Severn Trent Water
Bagthorpe (Cso)into River Erewash23 spills, 72 hours in 2025
1.2 km away
Severn Trent Water
Greenhill Industrial Estate Csointo Trib Of Cromford Canal1 spills, 0 hours in 2025
1.8 km away
Severn Trent Water
Eo At Brinsley Hill Pumping Stationinto River Erewash0 spills, 0 hours in 2025
36 planned, approved or being built and 6 running (17 MW between them). Those within 5 km are on the map above.
Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024 1.6 km away
Solar farm
Swanwick CollieryPlanning application in · 1 MW
Jul 2015 3.1 km away
Rooftop solar
Guilford Europe, Cotes Park Lane - Solar PanelsApproved, not yet built · 2 MW
Apr 2023 3.5 km away
Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023 3.6 km away
Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024 3.6 km away
Rooftop solar
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar PanelsApproved, not yet built · 270 kW
Sept 2023 3.7 km away
Rooftop solar
Aldercar Infant & Nursery School, Godkin Drive - Solar PanelsApproved, not yet built · 380 kW
Mar 2026 3.8 km away
Solar farm
Derby Road - Solar PanelsPlanning application in · 38 MW
Mar 2025 4.1 km away
Battery storage
Derby Road - Battery Energy Storage SystemPlanning application in · 40 MW
Mar 2025 4.1 km away
Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024 4.1 km away
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
Major
Providence Road, JacksdaleWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026 700 m away
Major
Main Road, JacksdaleNew service connection · National Grid Electricity Distribution (East Midlands) · Two-way signals
Oct 2026 to Oct 2026 800 m away
Major, planned
Albert Avenue, JacksdaleUtility asset works · CADENT GAS LIMITED · Road closure
Aug 2027 to Aug 2027 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Ripley Leisure Centre, Derby Road - Solar PV PanelsApproved, not yet built · 240 kW
Sept 2023 4.1 km away
Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 4.4 km away
Running nearest: Crow Trees Farm (solar farm, 6.4 km); Twin Yards Solar Farm (solar farm, 7.0 km); Newthorpe Wind Turbine (wind farm, 7.4 km); Sutton Landfill Site (landfill gas, 8.8 km); Newstead and Annesley Wind Turbine (wind farm, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 26.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.