Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
600hours of spills in 2025 between them (typical neighbourhood: about 36)
107spill events counted
Severn Trent Water
Pye Bridge Sewage Treatment Worksinto River Erewash44 spills, 360 hours in 2025
1.6 km away
Severn Trent Water
Brinsley-Hall Lane(Meadow Lodge)Csointo River Erewash15 spills, 87 hours in 2025
2.0 km away
Severn Trent Water
Ironville - Victoria Street Spsinto River Erewash25 spills, 81 hours in 2025
1.3 km away
Severn Trent Water
Bagthorpe (Cso)into River Erewash23 spills, 72 hours in 2025
700 m away
Severn Trent Water
Eo At Brinsley Hill Pumping Stationinto River Erewash0 spills, 0 hours in 2025
41 planned, approved or being built and 6 running (17 MW between them). Those within 5 km are on the map above.
Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024 2.2 km away
Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024 3.3 km away
Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 3.6 km away
Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024 3.7 km away
Rooftop solar
Aldercar Infant & Nursery School, Godkin Drive - Solar PanelsApproved, not yet built · 380 kW
Mar 2026 4.0 km away
Rooftop solar
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar PanelsApproved, not yet built · 270 kW
Sept 2023 4.1 km away
Rooftop solar
Guilford Europe, Cotes Park Lane - Solar PanelsApproved, not yet built · 2 MW
Apr 2023 4.1 km away
Solar farm
Swanwick CollieryPlanning application in · 1 MW
Jul 2015 4.6 km away
Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023 4.6 km away
Rooftop solar
Factory Tencate Advanced Composites Limited, Amber Drive - Solar PanelsApproved, not yet built · 470 kW
Road and street works within 1 km
6 permitted works running now or planned, 5 of them major.
Major, planned
York Avenue, JacksdaleUtility asset works · CADENT GAS LIMITED · Road closure
Aug 2027 to Aug 2027 550 m away
Major, planned
Wagstaff Lane, JacksdaleUtility asset works · CADENT GAS LIMITED · Road closure
Aug 2027 to Aug 2027 550 m away
Major, planned
Edward Avenue, JacksdaleUtility asset works · CADENT GAS LIMITED · Road closure
Aug 2027 to Aug 2027 600 m away
Major, planned
Albert Avenue, JacksdaleUtility asset works · CADENT GAS LIMITED · Road closure
Aug 2027 to Aug 2027 650 m away
Major
Main Road, JacksdaleNew service connection · National Grid Electricity Distribution (East Midlands) · Two-way signals
Oct 2026 to Oct 2026 700 m away
Standard
Rutland Road, JacksdaleUtility asset works · E S PIPELINES LTD · Two-way signals
Oct 2026 to Oct 2026 350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Heanor Road - Battery Energy Storage SystemApproved, not yet built · 40 MW
Feb 2025 5.4 km away
Rooftop solar
William Gregg Vc Leisure Centre, Hands Road - Solar PV PanelsPlanning application in · 230 kW
Jun 2023 5.5 km away
Running nearest: Crow Trees Farm (solar farm, 5.6 km); Twin Yards Solar Farm (solar farm, 6.6 km); Newthorpe Wind Turbine (wind farm, 7.0 km); Newstead and Annesley Wind Turbine (wind farm, 7.4 km); Sutton Landfill Site (landfill gas, 7.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 27.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.