Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
66hours of spills in 2025 between them (typical neighbourhood: about 36)
33spill events counted
Severn Trent Water
Cordy Lane Storm Overflowinto Brinsley Brook33 spills, 66 hours in 2025
40 planned, approved or being built and 6 running (17 MW between them). Those within 5 km are on the map above.
Rooftop solar
Aldercar Infant & Nursery School, Godkin Drive - Solar PanelsApproved, not yet built · 380 kW
Mar 2026 3.8 km away
Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024 4.2 km away
Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024 4.2 km away
Rooftop solar
Factory Tencate Advanced Composites Limited, Amber Drive - Solar PanelsApproved, not yet built · 470 kW
Dec 2022 4.4 km away
Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 4.6 km away
Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023 5.3 km away
Rooftop solar
William Gregg Vc Leisure Centre, Hands Road - Solar PV PanelsPlanning application in · 230 kW
Jun 2023 5.3 km away
Battery storage
Heanor Road - Battery Energy Storage SystemApproved, not yet built · 40 MW
Feb 2025 5.3 km away
Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024 5.4 km away
Rooftop solar
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar Panels
Road and street works within 1 km
1 permitted works running now or planned.
Minor
Main Road, UnderwoodUtility repair and maintenance works · National Grid Electricity Distribution (East Midlands) · Two-way signals
Oct 2026 to Oct 2026 350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.