Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
66hours of spills in 2025 between them (typical neighbourhood: about 36)
33spill events counted
Severn Trent Water
Cordy Lane Storm Overflowinto Brinsley Brook33 spills, 66 hours in 2025
44 planned, approved or being built and 6 running (17 MW between them). Those within 5 km are on the map above.
Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024 4.0 km away
Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 4.4 km away
Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024 4.5 km away
Rooftop solar
Aldercar Infant & Nursery School, Godkin Drive - Solar PanelsApproved, not yet built · 380 kW
Mar 2026 4.6 km away
Rooftop solar
Factory Tencate Advanced Composites Limited, Amber Drive - Solar PanelsApproved, not yet built · 470 kW
Dec 2022 5.1 km away
Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024 5.5 km away
Solar farm
Long Lane Solar Farm / Nottingham Brick WorksBeing built · 17 MW
Jul 2016 5.6 km away
Rooftop solar
William Gregg Vc Leisure Centre, Hands Road - Solar PV PanelsPlanning application in · 230 kW
Jun 2023 6.1 km away
Battery storage
Heanor Road - Battery Energy Storage SystemApproved, not yet built · 40 MW
Feb 2025 6.1 km away
Rooftop solar
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar PanelsApproved, not yet built · 270 kW
Road and street works within 1 km
1 permitted works running now or planned.
Standard
School Road, BagthorpeWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026 500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
ITP Aero, Harrier Park - Solar PanelsApproved, not yet built · 2 MW
Dec 2024 6.1 km away
Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023 6.1 km away
Running nearest: Newstead and Annesley Wind Turbine (wind farm, 5.4 km); Crow Trees Farm (solar farm, 6.0 km); Newthorpe Wind Turbine (wind farm, 6.1 km); Twin Yards Solar Farm (solar farm, 7.5 km); Sutton Landfill Site (landfill gas, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.