What's changing near NG16 4ES
Within 2 km, around Heanor South & Shipley Park in Amber Valley. Building, planning, schools, transport, prices and crime.
74new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.3%like-for-like prices in Heanor South & Shipley Park, 2024 → 2025 (council +2.6%)
+7%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
11 new homes completedhouses · Aug 2026 – Oct 2026
planned Oct 2026
1.6 km away - New homes
40 new homes completedhouses · Nov 2025 – Sep 2026
Sept 2026
150 m away - New homes
16 new homes completedflats · Nov 2025
Nov 2025
1.4 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 24 m²
24since energy certificates began (2008)
0in NG16 4ES itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
931hours of spills in 2025 between them (typical neighbourhood: about 36)
292spill events counted
- Severn Trent Water
Heanor-Milnhay Stwinto River Erewash38 spills, 306 hours in 2025
1.3 km away - Severn Trent Water
Cromford Road - Cso No 3into River Erewash63 spills, 243 hours in 2025
200 m away - Severn Trent Water
Jacksdale - Main Road (Cso)into Tributary Of River Erewash27 spills, 95 hours in 2025
1.3 km away - Severn Trent Water
Langley Mill - Station Road Csointo River Erewash28 spills, 62 hours in 2025
400 m away - Severn Trent Water
Lee Lane Csointo Trib Of Bailey Brook45 spills, 61 hours in 2025
1.2 km away - Severn Trent Water
Greenacres Avenue Csointo Bailey Brook24 spills, 41 hours in 2025
1.0 km away - Severn Trent Water
Eastwood - Mansfield Road Csointo Tributary Of River Erewash18 spills, 38 hours in 2025
1.3 km away - Severn Trent Water
Langley Mill - Milnhay Road Csointo Tributary Of River Erewash8 spills, 29 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
43 planned, approved or being built and 5 running (9 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Aldercar Infant & Nursery School, Godkin Drive - Solar PanelsApproved, not yet built · 380 kW
Mar 2026
650 m away - Rooftop solar
Factory Tencate Advanced Composites Limited, Amber Drive - Solar PanelsApproved, not yet built · 470 kW
Dec 2022
800 m away - Rooftop solar
William Gregg Vc Leisure Centre, Hands Road - Solar PV PanelsPlanning application in · 230 kW
Jun 2023
1.8 km away - Battery storage
Heanor Road - Battery Energy Storage SystemApproved, not yet built · 40 MW
Feb 2025
1.9 km away - Rooftop solar
Composites House, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025
3.0 km away - Rooftop solar
Synesqo, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025
3.0 km away - Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023
3.0 km away - Rooftop solar
Heanor Gate Spencer Academy, Kirkley Drive - Solar PanelsApproved, not yet built · 700 kW
Mar 2026
3.1 km away - Rooftop solar
Solvay Composites Derby - Solar PanelsApproved, not yet built · 300 kW
May 2025
3.1 km away - Battery storage
Old Power House - Battery Energy Storage UnitApproved, not yet built
Jul 20235.2 km away
Road and street works within 1 km
6 permitted works running now or planned, 3 of them major.
- Major
Elnor Street, HeanorHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Sept 2026 to Oct 2026
500 m away - Major, planned
Lower Dunstead Road, HeanorHighway improvement works · DERBYSHIRE COUNTY COUNCIL · Multi-way signals
Jan 2027 to Mar 2027
800 m away - Major
Lower Dunstead Road, HeanorHighway improvement works · DERBYSHIRE COUNTY COUNCIL · Multi-way signals
Jan 2027 to Mar 2027
800 m away - Standard
Amber Drive, HeanorSection 50 · DERBYSHIRE COUNTY COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026
800 m away - Standard
Unnamed A610 Off Slip Northbound From County Boundary To A608, HeanorWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Nov 2026 to Nov 2026
950 m away - Standard
A610 From New Derby Road Roundabout On Slip, EastwoodWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Nov 2026 to Nov 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
7.5 km away - Decideddecided Aug 2023
15.1 km away - Decideddecided Jan 2016
20.4 km away - RecommendationSept 2026
20.4 km away - RecommendationSept 2026
22.4 km away - Decideddecided Dec 2014
23.4 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Newthorpe Wind Turbine (wind farm, 3.4 km); Manners Avenue - Solar Panels (rooftop solar, 5.1 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 8.7 km); Newstead and Annesley Wind Turbine (wind farm, 9.5 km); Crow Trees Farm (solar farm, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.