Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
908hours of spills in 2025 between them (typical neighbourhood: about 36)
265spill events counted
Severn Trent Water
Heanor-Milnhay Stwinto River Erewash38 spills, 306 hours in 2025
500 m away
Severn Trent Water
Cromford Road - Cso No 3into River Erewash63 spills, 243 hours in 2025
1.2 km away
Severn Trent Water
Jacksdale - Main Road (Cso)into Tributary Of River Erewash27 spills, 95 hours in 2025
800 m away
Severn Trent Water
Langley Mill - Station Road Csointo River Erewash28 spills, 62 hours in 2025
1000 m away
Severn Trent Water
Lee Lane Csointo Trib Of Bailey Brook45 spills, 61 hours in 2025
1.0 km away
Severn Trent Water
Greenacres Avenue Csointo Bailey Brook24 spills, 41 hours in 2025
2.0 km away
Severn Trent Water
Eastwood - Mansfield Road Csointo Tributary Of River Erewash18 spills, 38 hours in 2025
800 m away
Severn Trent Water
Langley Mill - Milnhay Road Csointo Tributary Of River Erewash8 spills, 29 hours in 2025
41 planned, approved or being built and 4 running (5 MW between them). Those within 5 km are on the map above.
Rooftop solar
Factory Tencate Advanced Composites Limited, Amber Drive - Solar PanelsApproved, not yet built · 470 kW
Dec 2022 1.4 km away
Rooftop solar
Aldercar Infant & Nursery School, Godkin Drive - Solar PanelsApproved, not yet built · 380 kW
Mar 2026 1.9 km away
Rooftop solar
William Gregg Vc Leisure Centre, Hands Road - Solar PV PanelsPlanning application in · 230 kW
Jun 2023 2.4 km away
Battery storage
Heanor Road - Battery Energy Storage SystemApproved, not yet built · 40 MW
Feb 2025 2.6 km away
Rooftop solar
Composites House, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025 3.6 km away
Rooftop solar
Synesqo, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025 3.6 km away
Rooftop solar
Solvay Composites Derby - Solar PanelsApproved, not yet built · 300 kW
May 2025 3.7 km away
Rooftop solar
Heanor Gate Spencer Academy, Kirkley Drive - Solar PanelsApproved, not yet built · 700 kW
Mar 2026 3.8 km away
Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023 4.2 km away
Battery storage
Old Power House - Battery Energy Storage UnitApproved, not yet built
Jul 20234.3 km away
Road and street works within 1 km
11 permitted works running now or planned, 2 of them major.
Major, planned
Midland Road, EastwoodWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 600 m away
Major
Midland Road, EastwoodWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 600 m away
Standard
A610 From New Derby Road Roundabout On Slip, EastwoodWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Nov 2026 to Nov 2026 350 m away
Standard
Unnamed A610 Off Slip Northbound From County Boundary To A608, HeanorWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Nov 2026 to Nov 2026 400 m away
Standard
Mansfield Road, EastwoodCore Sampling · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 500 m away
Standard
Derby Road, EastwoodCore Sampling · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 500 m away
Standard
Kelham Way, EastwoodCore Sampling · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 500 m away
Minor
South Street, EastwoodNew service connection · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026 450 m away
Minor
Church Street, EastwoodWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 550 m away
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Queens Road North, EastwoodWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026 650 m away
Minor
Kimberley/Eastwood Bypass, EastwoodOptional permit (no fee) e.g. for traffic management etc · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 23.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.