Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
932hours of spills in 2025 between them (typical neighbourhood: about 36)
189spill events counted
Severn Trent Water
Newthorpe Sewage Treatment Worksinto Gilt Brook42 spills, 326 hours in 2025
950 m away
Severn Trent Water
Cossall Combined Sewer Overflowinto River Erewash37 spills, 300 hours in 2025
1.8 km away
Severn Trent Water
Newthorpe Sewage Treatment Worksinto Gilt Brook47 spills, 225 hours in 2025
950 m away
Severn Trent Water
East Of Stratford Street Csointo River Erewash39 spills, 73 hours in 2025
1.2 km away
Severn Trent Water
Barlow Cottages Csointo Gilt Brook13 spills, 4 hours in 2025
850 m away
Severn Trent Water
Giltway - Nottingham Road Csointo Gilt Brook8 spills, 4 hours in 2025
1.6 km away
Severn Trent Water
Newtons Lane Junction Csointo Tributary Of River Erewash3 spills, 0 hours in 2025
400 m away
Severn Trent Water
Awsworth - The Glebe (Cso)into Nottingham Canal (Disused)0 spills, 0 hours in 2025
49 planned, approved or being built and 5 running (5 MW between them). Those within 5 km are on the map above.
Rooftop solar
Sainsburys Supermarket, Greens Lane - Solar PanelsPlanning application in · 310 kW
May 2026 2.0 km away
Battery storage
Old Power House - Battery Energy Storage UnitApproved, not yet built
Jul 2023 2.8 km away
Solar farm
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in · 16 MW
Feb 2025 3.2 km away
Battery storage
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in
Feb 2025 3.2 km away
Rooftop solar
Donaldson Timber, Hallam Fields Road - Solar PanelsApproved, not yet built · 240 kW
Mar 2025 4.1 km away
Rooftop solar
Crompton Road - Solar PanelsApproved, not yet built · 400 kW
May 2022 4.2 km away
Solar farm
Long Lane Solar Farm / Nottingham Brick WorksBeing built · 17 MW
Jul 2016 4.5 km away
Rooftop solar
Factory Tencate Advanced Composites Limited, Amber Drive - Solar PanelsApproved, not yet built · 470 kW
Dec 2022 4.6 km away
Rooftop solar
Blenheim Park Road - Solar PanelsApproved, not yet built · 170 kW
Jan 2025 4.7 km away
Rooftop solar
Hadden Court, Glaisdale Parkway - Roof Mounted Solar PanelsApproved, not yet built · 330 kW
Nov 20245.0 km away
Road and street works within 1 km
7 permitted works running now or planned, 6 of them major.
Major, planned
Barlow Drive North, AwsworthWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 500 m away
Major
Barlow Drive North, AwsworthWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 500 m away
Major
Main Street, AwsworthUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026 600 m away
Major, planned
Main Street, AwsworthUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027 650 m away
Major, planned
Church Lane, CossallWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away
Major
Church Lane, CossallWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away
Minor
Coronation Road, CossallWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 23.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.