Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
50 planned, approved or being built and 12 running (26 MW between them). Those within 5 km are on the map above.
Rooftop solar
Harvey Hadden Sports Village, Wigman Road - Solar PanelsApproved, not yet built · 300 kW
Feb 2025 2.2 km away
Rooftop solar
Sainsburys Supermarket, Greens Lane - Solar PanelsPlanning application in · 310 kW
May 2026 2.2 km away
Rooftop solar
Bluecoat Beechdale Academy, Harvey Road - Solar PanelsApproved, not yet built · 320 kW
Nov 2025 2.4 km away
Rooftop solar
Aspect Business Park - Solar PanelsApproved, not yet built · 270 kW
Mar 2024 2.7 km away
Rooftop solar
Hadden Court, Glaisdale Parkway - Roof Mounted Solar PanelsApproved, not yet built · 330 kW
Nov 2024 2.8 km away
Rooftop solar
Glaisdale Point, Units 10 To 12 - Roof Mounted Solar PV ArrayApproved, not yet built · 270 kW
Feb 2025 2.8 km away
Rooftop solar
Blenheim Park Road - Solar PanelsApproved, not yet built · 170 kW
Jan 2025 3.0 km away
Energy from waste
Bulwell EnergyBeing built · 30 MW
May 2017 3.1 km away
Rooftop solar
Bulwell Academy, Squires Avenue - Solar PanelsApproved, not yet built · 150 kW
Mar 2026 3.5 km away
Solar farm
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in · 16 MW
Feb 2025 3.5 km away
Road and street works within 1 km
8 permitted works running now or planned, 4 of them major.
Major, planned
Mornington Crescent, NuthallWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 200 m away
Major, planned
Mornington Crescent, NuthallWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 300 m away
Major, planned
Woodhouse Way, NuthallWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 300 m away
Major, planned
Woodhouse Way, NuthallWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 350 m away
Minor
A610 (J26 M1 To Nuthall Roundabout), NuthallWorks for road purposes · NATIONAL HIGHWAYS · Lane closure
Oct 2026 to Oct 2026 550 m away
Minor
A610 (J26 M1 To Nuthall Roundabout), NuthallOptional permit (no fee) e.g. for traffic management etc · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 650 m away
Minor
Junction 26 Roundabout, NuthallOptional permit (no fee) e.g. for traffic management etc · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 650 m away
Minor
Nuthall Roundabout, NuthallOptional permit (no fee) e.g. for traffic management etc · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 25.8 km away
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.