What's changing near NG15 9DG
Within 2 km, around Ravenshead & Newstead in Gedling. Building, planning, schools, transport, prices and crime.
40new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.2%like-for-like prices in Ravenshead & Newstead, 2024 → 2025 (council +1.9%)
+55%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
26 new homes completedhouses · Jun 2025 – Oct 2026
Oct 2026
1.1 km away - New homes
5 new homes completedhouses · Dec 2025 – Oct 2026
Oct 2026
1.1 km away - New homes
5 new homes completedhouses · Aug 2025 – Oct 2026
Oct 2026
1000 m away - New school
New school: Longdale Lodge Outdoor Learning CentreOther independent special school, other independent special school
Jan 2026
1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 45 m²
31since energy certificates began (2008)
4in NG15 9DG itself
- Extendedcertificate 2025
- Extendedcertificate 2025
- Extendedcertificate 2023
- Extendedcertificate 2020
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
22 planned, approved or being built and 9 running (89 MW between them). Those within 5 km are on the map above.
- Solar farm
Two Oaks Quarry, Coxmoor Road - Solar ArrayApproved, not yet built · 4 MW
Jan 2024
3.7 km away - Rooftop solar
Linney Group, Adamsway - Solar PanelsApproved, not yet built · 200 kW
Jun 2023
4.6 km away - Rooftop solar
Hucknall Leisure Centre, Linby Road - Solar PanelsApproved, not yet built
Feb 2025
6.0 km away - Rooftop solar
Sherwood Way SouthApproved, not yet built · 3 MW
Sept 2021
6.1 km away - Battery storage
Kestral Road - Battery Energy Storage FacilityApproved, not yet built
Dec 2023
6.2 km away - Rooftop solar
Lamtek Limited, Wolsey Drive - Solar PanelsApproved, not yet built · 810 kW
Sept 2025
6.5 km away - Rooftop solar
The Samworth Church Academy, Sherwood Hall Road - Solar PanelsApproved, not yet built · 320 kW
Dec 2025
6.7 km away - Rooftop solar
Romo, Oddicroft Lane - Solar PanelsApproved, not yet built · 1 MW
May 2024
6.9 km away - Rooftop solar
Crown Farm Way - Solar PhotovoltaicApproved, not yet built · 330 kW
Oct 2022
6.9 km away - Rooftop solar
Sutton Road - Solar PanelsApproved, not yet built · 410 kW
Mar 2022
7.0 km away - Battery storage
Road and street works within 1 km
12 permitted works running now or planned, 12 of them major.
- Major
Cheriton Drive, RavensheadWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
0 m away - Major
Downham Gardens, RavensheadWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
100 m away - Major
Ashford Drive, RavensheadWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
250 m away - Major
Wood End Drive, RavensheadWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
300 m away - Major
Lea Road, RavensheadWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
300 m away - Major
Castleton Close, RavensheadWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
350 m away - Major
Lea Close, RavensheadWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Aug 2026 to Nov 2026
350 m away - Major, planned
Haddon Road, RavensheadUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
350 m away - Major
Haddon Road, RavensheadUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
350 m away
Major infrastructure projects within 30 km
- Decisionapplication due July 2025
18.5 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
20.0 km away - Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent decided Oct 2025
23.4 km away - Decideddecided Aug 2023
28.6 km away - Decideddecided Jan 2016
29.2 km away - RecommendationSept 2026
29.2 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lindhurst Wind Farm (wind farm, 3.3 km); Newstead and Annesley Wind Turbine (wind farm, 4.3 km); Burntstump Landfill Scheme (landfill gas, 5.2 km); Inkersall Grange Farm (solar farm, 7.5 km); Dorket Head (landfill gas, 7.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.