Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
207hours of spills in 2025 between them (typical neighbourhood: about 36)
43spill events counted
Severn Trent Water
Stoke Bardolph Stwinto River Trent14 spills, 107 hours in 2025
1.7 km away
Severn Trent Water
Burton Joyce Ps Emergency Overflowinto River Trent (Non Tidal)29 spills, 99 hours in 2025
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
Eastcroft EfW (3rd Line)Approved, not yet built · 3 MW
Jan 2016 8.1 km away
Rooftop solar
Nottingham One, Canal Street- Solar PanelsApproved, not yet built · 180 kW
May 2026 8.3 km away
Running nearest: Stoke Bardolph energy crop (Farm AD) (anaerobic digestion, 1.4 km); Severn Trent Water - Stoke Bardolph Wind Turbine (wind farm, 1.5 km); Gedling Solar Farm (solar farm, 3.0 km); Colwick Industrial Estate (Farm and Food waste) (anaerobic digestion, 4.2 km); Radcliffe Solar Farm (solar farm, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 26.4 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 27.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.