Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
735hours of spills in 2025 between them (typical neighbourhood: about 36)
82spill events counted
Severn Trent Water
Keyworth Sewage Treatment Worksinto Tributary Of Fairham Brook46 spills, 604 hours in 2025
1.9 km away
Severn Trent Water
Keyworth - Platt Lane Spsinto Tributary Of Polser Brook13 spills, 52 hours in 2025
1.1 km away
Severn Trent Water
Keyworth - Wynbreck Dr Csointo Tributary Of Polser Brook16 spills, 48 hours in 2025
39 planned, approved or being built and 15 running (93 MW between them). Those within 5 km are on the map above.
Rooftop solar
British Geological, Keywork Solar PanelsBeing built · 620 kW
Jan 2021 900 m away
Rooftop solar
Wells Agriculture Barn Farm, Flawforth Lane - Solar PV SystemApproved, not yet built · 320 kW
Mar 2023 3.3 km away
Solar farm
Old Wood Energy Park - Solar Pv PanelApproved, not yet built · 50 MW
Jun 2026 4.0 km away
Battery storage
Old Wood Energy Park - Battery Energy StorageApproved, not yet built · 85 MW
Jun 2026 4.0 km away
Biomass
John Brooke Sawmills Limited - Biomass GasifierApproved, not yet built
Apr 2022 4.2 km away
Rooftop solar
Frontier Agriculture, Ruddington - Solar PVApproved, not yet built · 450 kW
Mar 2023 4.2 km away
Rooftop solar
John Brooke Sawmills, Fosse Way - Solar PanelsApproved, not yet built · 170 kW
Oct 2025 4.4 km away
Solar farm
Highfields Farm - Solar Farm & Battery StorageApproved, not yet built · 43 MW
Feb 2023 4.6 km away
Battery storage
Highfields Farm - Solar Farm & Battery StorageApproved, not yet built · 8 MW
Feb 2023 4.6 km away
Rooftop solar
Monarch Education Furniture - Solar panelsApproved, not yet built · 880 kW
Mar 2024 4.6 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
Major, planned
Church Drive, KeyworthNew service connection · National Grid Electricity Distribution (East Midlands) · Road closure
Oct 2026 to Oct 2026 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Keyworth South: +23% over five years (2020 → 2025).
Council tax list: 80 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.5% in two years.