Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
144hours of spills in 2025 between them (typical neighbourhood: about 36)
34spill events counted
Severn Trent Water
Tollerton - Lothian Road Spsinto Tributary Of River Trent25 spills, 115 hours in 2025
1.1 km away
Severn Trent Water
West Bridgford – Leahurst Gardens (Cso)into Unnamde Tributary Of The River Trent3 spills, 16 hours in 2025
1.9 km away
Severn Trent Water
West Bridgford - Greythorn Dr 100 (Cso)into Tributary Of The River Trent6 spills, 13 hours in 2025
52 planned, approved or being built and 15 running (45 MW between them). Those within 5 km are on the map above.
Rooftop solar
Wheatcrofts Business Park, Edwalton - Solar PanelsApproved, not yet built · 150 kW
Nov 2024 450 m away
Rooftop solar
Langley House, Wheatcroft Business Park - Solar PanelsApproved, not yet built · 180 kW
Apr 2026 450 m away
Rooftop solar
Rushcliffe School, Boundary Road - Solar PanelsApproved, not yet built
Apr 2026 1.1 km away
Rooftop solar
Frontier Agriculture, Ruddington - Solar PVApproved, not yet built · 450 kW
Mar 2023 1.7 km away
Rooftop solar
Rushcliffe arena, Rugby Road - Solar PanelsApproved, not yet built · 470 kW
Apr 2026 2.3 km away
Rooftop solar
David Lloyd Leisure Health and Fitness Club, Rugby Road - Solar panelsApproved, not yet built · 300 kW
Mar 2024 2.4 km away
Rooftop solar
Wells Agriculture Barn Farm, Flawforth Lane - Solar PV SystemApproved, not yet built · 320 kW
Mar 2023 2.6 km away
Rooftop solar
Monarch Education Furniture - Solar panelsApproved, not yet built · 880 kW
Mar 2024 2.7 km away
Rooftop solar
Ideagen, Mere Way - Solar PanelsApproved, not yet built · 150 kW
Jun 2023 3.1 km away
Solar farm
Fair Oaks Renewable Energy Park - Solar farm & Battery energy storageApproved, not yet built · 50 MW
Oct 20233.7 km away
Road and street works within 1 km
18 permitted works running now or planned, 17 of them major.
Major, planned
Melton Road, EdwaltonUtility asset works · CADENT GAS LIMITED · Multi-way signals
Aug 2027 to Dec 2027 450 m away
Major, planned
Village Street, EdwaltonUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Sept 2027 to Oct 2027 600 m away
Major, planned
Melton Road, EdwaltonDiversionary works · National Grid Electricity Distribution (East Midlands) · Some carriageway incursion
Sept 2026 to Oct 2026 650 m away
Major
Melton Road, EdwaltonDiversionary works · National Grid Electricity Distribution (East Midlands) · Some carriageway incursion
Sept 2026 to Oct 2026 650 m away
Major, planned
Melton Road, EdwaltonUtility asset works · CITYFIBRE METRO NETWORKS LTD · Some carriageway incursion
Oct 2026 to Oct 2026 700 m away
Major, planned
A52 From Dualling East Of Gamston To J A606, RushcliffeDiversionary works · National Grid Electricity Distribution (East Midlands) · Some carriageway incursion
Sept 2026 to Oct 2026 700 m away
Major
A52 From Dualling East Of Gamston To J A606, RushcliffeDiversionary works · National Grid Electricity Distribution (East Midlands) · Some carriageway incursion
Sept 2026 to Oct 2026 700 m away
Major, planned
A52 From Dualling East Of Gamston To J A606, RushcliffeDiversionary works · Zayo Europe · Road closure
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 16.1 km away
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
decided Oct 2025 29.2 km away
Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 29.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.