Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
205hours of spills in 2025 between them (typical neighbourhood: about 36)
35spill events counted
Severn Trent Water
Tollerton - Lothian Road Spsinto Tributary Of River Trent25 spills, 115 hours in 2025
950 m away
Severn Trent Water
Hoe Hill Pumping Stationinto Polser Brook10 spills, 90 hours in 2025
45 planned, approved or being built and 16 running (55 MW between them). Those within 5 km are on the map above.
Rooftop solar
Monarch Education Furniture - Solar panelsApproved, not yet built · 880 kW
Mar 2024 1.3 km away
Rooftop solar
Wheatcrofts Business Park, Edwalton - Solar PanelsApproved, not yet built · 150 kW
Nov 2024 2.1 km away
Rooftop solar
Langley House, Wheatcroft Business Park - Solar PanelsApproved, not yet built · 180 kW
Apr 2026 2.1 km away
Rooftop solar
Frontier Agriculture, Ruddington - Solar PVApproved, not yet built · 450 kW
Mar 2023 2.4 km away
Rooftop solar
Rushcliffe School, Boundary Road - Solar PanelsApproved, not yet built
Apr 2026 2.5 km away
Rooftop solar
Wells Agriculture Barn Farm, Flawforth Lane - Solar PV SystemApproved, not yet built · 320 kW
Mar 2023 2.7 km away
Rooftop solar
British Geological, Keywork Solar PanelsBeing built · 620 kW
Jan 2021 2.8 km away
Rooftop solar
Ideagen, Mere Way - Solar PanelsApproved, not yet built · 150 kW
Jun 2023 3.9 km away
Rooftop solar
Rushcliffe arena, Rugby Road - Solar PanelsApproved, not yet built · 470 kW
Apr 2026 4.1 km away
Rooftop solar
David Lloyd Leisure Health and Fitness Club, Rugby Road - Solar panelsApproved, not yet built · 300 kW
Mar 2024 4.2 km away
Road and street works within 1 km
2 permitted works running now or planned.
Minor
Melton Road, TollertonHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 550 m away
Minor
Melton Road, TollertonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.