What's changing near NG12 2HE
Within 2 km, around Radcliffe on Trent & Shelford in Rushcliffe. Building, planning, schools, transport, prices and crime.
186new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+9.1%like-for-like prices in Radcliffe on Trent & Shelford, 2024 → 2025 (council +2.5%)
+20%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
25 new homes completedhouses · Nov 2024 – Oct 2026
planned Oct 2026
350 m away - New homes
5 new homes completedhouses · Jul 2025 – Oct 2026
planned Oct 2026
750 m away - New homes
27 new homes completed4 flats, 23 houses · Sep 2025 – Oct 2026
planned Oct 2026
700 m away - New homes
20 new homes completed4 flats, 16 houses · Sep 2025 – Oct 2026
Oct 2026
750 m away - New homes
12 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
600 m away - New homes
13 new homes completedhouses · Aug 2026 – Sep 2026
Sept 2026
500 m away - New homes
22 new homes completedhouses · May 2025 – Jul 2026
Jul 2026
400 m away - New homes
9 new homes completedhouses · Feb 2026
Mar 2026
400 m away - New homes
5 new homes completed1 flats, 4 houses · Jul 2025 – Nov 2025
Nov 2025
750 m away - New homes
22 new homes completedhouses · Jan 2025 – Jun 2025
Jun 2025
300 m away - New homes
16 new homes completed4 flats, 12 houses · Jan 2025 – May 2025
May 2025
250 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 16 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 26 m²
21since energy certificates began (2008)
0in NG12 2HE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
342hours of spills in 2025 between them (typical neighbourhood: about 36)
97spill events counted
- Severn Trent Water
Bingham Road Csointo Trib Of River Trent95 spills, 338 hours in 2025
1.4 km away - Severn Trent Water
Sydney Grove Sewage Pumping Stationinto Unnamed Trib River Trent2 spills, 5 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 12 running (46 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Enviro Building, Colwick - Solar PanelsApproved, not yet built · 260 kW
Jul 2025
2.6 km away - Rooftop solar
ENVA England, Road Number 4 - Solar PanelsApproved, not yet built · 1 MW
Jul 2025
2.6 km away - Solar farm
Heron Solar Farm & Battery StorageApproved, not yet built · 20 MW
Aug 2024
2.8 km away - Battery storage
Heron Solar Farm & Battery StorageApproved, not yet built · 20 MW
Aug 2024
2.8 km away - Solar farm
Radcliffe Road, Holme Pierrepont - Solar FarmApproved, not yet built · 4 MW
Dec 2022
3.0 km away - Rooftop solar
Pintail House, Pintail Close - Solar PanelsApproved, not yet built · 410 kW
May 2025
3.0 km away - Rooftop solar
Colwick Loop Road, Colwick - Solar PanelsApproved, not yet built · 750 kW
Sept 2023
3.5 km away - Hydro
Gunthorpe WeirApproved, not yet built · 300 kW
Mar 2019
5.2 km away - Rooftop solar
Monarch Education Furniture - Solar panelsApproved, not yet built · 880 kW
Mar 2024
5.8 km away - Battery storage
Burton Wood Farm, Spring Lane - Battery Energy StorageApproved, not yet built · 320 MW
Mar 2025
5.9 km away - Solar farm
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton. application due March 2028
17.8 km away - Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent decided Oct 2025
21.1 km away - Decideddecided Jan 2016
22.2 km away - RecommendationSept 2026
22.2 km away - Decisionapplication due July 2025
23.3 km away - Recommendation
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Colwick Industrial Estate (Farm and Food waste) (anaerobic digestion, 2.4 km); Radcliffe Solar Farm (solar farm, 2.9 km); Stragglethorpe Road farm (solar farm, 3.2 km); Stoke Bardolph energy crop (Farm AD) (anaerobic digestion, 3.2 km); Severn Trent Water - Stoke Bardolph Wind Turbine (wind farm, 3.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.