What's changing near NG12 2DE
Within 2 km, around Radcliffe on Trent & Shelford in Rushcliffe. Building, planning, schools, transport, prices and crime.
214new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+9.1%like-for-like prices in Radcliffe on Trent & Shelford, 2024 → 2025 (council +2.5%)
+20%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
25 new homes completedhouses · Nov 2024 – Oct 2026
planned Oct 2026
1.6 km away - New homes
54 new homes completedhouses · Jun 2025 – Sep 2026
Sept 2026
800 m away - New homes
24 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
850 m away - New homes
13 new homes completedhouses · Aug 2026 – Sep 2026
Sept 2026
1.6 km away - New homes
22 new homes completedhouses · May 2025 – Jul 2026
Jul 2026
1.6 km away - New homes
9 new homes completedhouses · Feb 2026
Mar 2026
1.6 km away - New homes
17 new homes completedhouses · Jul 2025 – Dec 2025
Dec 2025
850 m away - New homes
6 new homes completedhouses · Jul 2025
Aug 2025
850 m away - New homes
22 new homes completedhouses · Jan 2025 – Jun 2025
Jun 2025
1.6 km away - New homes
16 new homes completed4 flats, 12 houses · Jan 2025 – May 2025
May 2025
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
12homes extended 2021–2025, typically adding 25 m²
18since energy certificates began (2008)
3in NG12 2DE itself
- Extendedcertificate 2024
- Extendedcertificate 2023
- Extendedcertificate 2020
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
520hours of spills in 2025 between them (typical neighbourhood: about 36)
116spill events counted
- Severn Trent Water
Bingham Road Csointo Trib Of River Trent95 spills, 338 hours in 2025
650 m away - Severn Trent Water
Radcliffe-On-Trent Stwinto River Trent19 spills, 178 hours in 2025
1.4 km away - Severn Trent Water
Sydney Grove Sewage Pumping Stationinto Unnamed Trib River Trent2 spills, 5 hours in 2025
500 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
34 planned, approved or being built and 14 running (49 MW between them). Those within 5 km are on the map above.
- Solar farm
Radcliffe Road, Holme Pierrepont - Solar FarmApproved, not yet built · 4 MW
Dec 2022
1.6 km away - Rooftop solar
Enviro Building, Colwick - Solar PanelsApproved, not yet built · 260 kW
Jul 2025
1.8 km away - Rooftop solar
ENVA England, Road Number 4 - Solar PanelsApproved, not yet built · 1 MW
Jul 2025
1.8 km away - Rooftop solar
Pintail House, Pintail Close - Solar PanelsApproved, not yet built · 410 kW
May 2025
2.3 km away - Solar farm
Heron Solar Farm & Battery StorageApproved, not yet built · 20 MW
Aug 2024
2.5 km away - Battery storage
Heron Solar Farm & Battery StorageApproved, not yet built · 20 MW
Aug 2024
2.5 km away - Rooftop solar
Colwick Loop Road, Colwick - Solar PanelsApproved, not yet built · 750 kW
Sept 2023
2.7 km away - Rooftop solar
Monarch Education Furniture - Solar panelsApproved, not yet built · 880 kW
Mar 2024
4.5 km away - Battery storage
Burton Wood Farm, Spring Lane - Battery Energy StorageApproved, not yet built · 320 MW
Mar 2025
5.9 km away - Rooftop solar
Rushcliffe School, Boundary Road - Solar PanelsApproved, not yet built
Apr 2026
6.2 km away - Energy from waste
Road and street works within 1 km
6 permitted works running now or planned, 6 of them major.
- Major
Orford Avenue, Radcliffe On TrentUtility asset works · SEVERN TRENT WATER · Two-way signals
Sept 2026 to Oct 2026
150 m away - Major, planned
Vicarage Lane, Radcliffe On TrentUtility asset works · SEVERN TRENT WATER · Some carriageway incursion
Sept 2026 to Dec 2026
250 m away - Major
Vicarage Lane, Radcliffe On TrentUtility asset works · SEVERN TRENT WATER · Some carriageway incursion
Sept 2026 to Dec 2026
250 m away - Major
Vicarage Lane, Radcliffe On TrentUtility asset works · SEVERN TRENT WATER · Some carriageway incursion
Sept 2026 to Oct 2026
250 m away - Major
Main Road, Radcliffe On TrentUtility asset works · SEVERN TRENT WATER · Multi-way signals
Sept 2026 to Dec 2026
400 m away - Major
Lamcote Gardens, Radcliffe On TrentUtility asset works · SEVERN TRENT WATER · Some carriageway incursion
Oct 2026 to Oct 2026
500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton. application due March 2028
17.5 km away - Decideddecided Jan 2016
20.8 km away - RecommendationSept 2026
20.8 km away - Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent decided Oct 2025
22.4 km away - RecommendationSept 2026
22.9 km away - Decision
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Radcliffe Solar Farm (solar farm, 1.5 km); Colwick Industrial Estate (Farm and Food waste) (anaerobic digestion, 1.5 km); Stragglethorpe Road farm (solar farm, 2.0 km); Cotgrave solar farm (solar farm, 2.9 km); Severn Trent Water - Stoke Bardolph Wind Turbine (wind farm, 3.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.