What's changing near NG10 5FX
Within 2 km, around Sandiacre & Stanton in Erewash. Building, planning, schools, transport, prices and crime.
74new homes completed within 2 km, last 2 years
130homes given permission on brownfield sites since 2021
+1.2%like-for-like prices in Sandiacre & Stanton, 2024 → 2025 (council +2.7%)
-10%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
11 new homes completedhouses · Jan 2026 – Oct 2026
Oct 2026
1.1 km away - New school
New school: Hemlock Stone SchoolOther independent special school, other independent special school
Mar 2026
1.7 km away - New homes
8 new homes completedhouses · Jan 2026
Jan 2026
400 m away - New homes
8 new homes completedhouses · Jan 2026
Jan 2026
750 m away - Planning permissionAug 2025
1.4 km away - New homes
9 new homes completedhouses · Jul 2025
Jul 2025
1.9 km away - New homes
15 new homes completedflats · Apr 2025
Apr 2025
2.0 km away - Planning permission
Permission for 10 homesPublic House, East Of 9, Derby Road, Sandiacre, Derbyshire, NG10 5HW (full planning permission) Dec 2024
350 m away - New homes
8 new homes completedhouses · Nov 2024
Dec 2024
900 m away - Planning permissionOct 2024300 m away
9homes extended 2021–2025, typically adding 41 m²
14since energy certificates began (2008)
0in NG10 5FX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
537hours of spills in 2025 between them (typical neighbourhood: about 36)
119spill events counted
- Severn Trent Water
Pasture Lock Csointo Tributary Of Erewash Canal52 spills, 210 hours in 2025
1.6 km away - Severn Trent Water
Sandiacre - Mark Street (So)into River Erewash27 spills, 162 hours in 2025
1.1 km away - Severn Trent Water
Stapleford-Bessell Lane Wwtwinto Tributary Of River Erewash19 spills, 126 hours in 2025
1.4 km away - Severn Trent Water
Crossley Ps - Storm/Emergency Ofinto River Erewash10 spills, 21 hours in 2025
850 m away - Severn Trent Water
Sandiacre Road Pumping Station Ssointo River Erewash2 spills, 17 hours in 2025
900 m away - Severn Trent Water
Starch Lane Csointo River Erewash9 spills, 1 hours in 2025
750 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
43 planned, approved or being built and 8 running (17 MW between them). Those within 5 km are on the map above.
- Rooftop solar
George Spencer Academy, Arthur Mee Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
1.9 km away - Battery storage
Southfields Farm, Common Lane - Battery StorageApproved, not yet built · 130 MW
Aug 2024
3.0 km away - Rooftop solar
Crompton Road - Solar PanelsApproved, not yet built · 400 kW
May 2022
3.1 km away - Solar farm
Boyah Grange Solar Farm, Potato Pit Lane - Solar FarmPlanning application in · 35 MW
Aug 2025
3.2 km away - Rooftop solar
Donaldson Timber, Hallam Fields Road - Solar PanelsApproved, not yet built · 240 kW
Mar 2025
3.2 km away - Battery storage
Tamworth Road, Long Eaton - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
3.8 km away - Solar farm
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in · 16 MW
Feb 2025
4.6 km away - Battery storage
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in
Feb 2025
4.6 km away - Rooftop solar
Heart Internet, Beeston Business Park - Solar PanelsApproved, not yet built · 570 kW
Jan 2025
5.9 km away - Solar farm
Pinnacle Storage Park, Dale Abbey - Solar PV PanelsBeing built · 1 MW
Jan 20235.9 km away
Road and street works within 1 km
10 permitted works running now or planned, 8 of them major.
- Major, planned
Victoria Road, SandiacreNew service connection · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
200 m away - Major
Victoria Road, SandiacreNew service connection · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
200 m away - Major, planned
Derby Road, SandiacreUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
450 m away - Major, planned
Stanton Road, SandiacreUtility asset works · O2 (UK) LIMITED · Road closure
Dec 2026 to Dec 2026
500 m away - Major
Stanton Road, SandiacreUtility asset works · O2 (UK) LIMITED · Road closure
Dec 2026 to Dec 2026
500 m away - Major
Town Street, SandiacreUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026
550 m away - Major, planned
Bradley Street, SandiacreUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026
800 m away - Major
Bradley Street, SandiacreUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026
800 m away - Standard
Derby Road, SandiacreUtility repair and maintenance works · SEVERN TRENT WATER · Multi-way signals
Oct 2026 to Oct 2026
300 m away
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
9.3 km away - RecommendationSept 2026
9.3 km away - RecommendationSept 2026
11.5 km away - Decideddecided Aug 2023
13.6 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
15.4 km away - Decideddecided Dec 2014
18.2 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 2.8 km); Beeston Weir Hydro Scheme (hydro, 6.0 km); Manners Avenue - Solar Panels (rooftop solar, 6.1 km); Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels (rooftop solar, 7.2 km); Derby Sewage Treatment Works (wind farm, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.