Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
305hours of spills in 2025 between them (typical neighbourhood: about 36)
62spill events counted
Severn Trent Water
Sandiacre - Mark Street (So)into River Erewash27 spills, 162 hours in 2025
2.0 km away
Severn Trent Water
Stapleford-Bessell Lane Wwtwinto Tributary Of River Erewash19 spills, 126 hours in 2025
1.8 km away
Severn Trent Water
Wilsthorpe Road Spsinto Golden Brook5 spills, 13 hours in 2025
1.7 km away
Severn Trent Water
Bennett Street Csointo River Erewash1 spills, 2 hours in 2025
500 m away
Severn Trent Water
Woodstock Road Csointo River Erewash8 spills, 1 hours in 2025
1.1 km away
Severn Trent Water
Portland Road/Carrfield Avenue Ssointo River Erewash2 spills, 1 hours in 2025
1.2 km away
Severn Trent Water
Breaston - Woodland Avenue (Cso) into Golden Brook0 spills, 0 hours in 2025
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
William Street, Long EatonUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Some carriageway incursion
Nov 2026 to Nov 2026 650 m away
Standard
Tamworth Road, Long EatonHighway improvement works · DERBYSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 650 m away
Standard
College Street, Long EatonUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Stop/go boards
Oct 2026 to Nov 2026 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 19.2 km away
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
application due March 2028 24.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.