What's changing near NG10 4GE
Within 2 km, around Long Eaton West in Erewash. Building, planning, schools, transport, prices and crime.
202new homes completed within 2 km, last 2 years
189homes given permission on brownfield sites since 2021
+0.6%like-for-like prices in Long Eaton West, 2024 → 2025 (council +2.7%)
+20%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
76 new homes completed59 flats, 17 houses · Jul 2025 – Aug 2026
Aug 2026
400 m away - New homes
24 new homes completedhouses · Apr 2025 – Aug 2026
Aug 2026
350 m away - New homes
5 new homes completedhouses · Dec 2025 – May 2026
May 2026
550 m away - New homes
8 new homes completedhouses · Jan 2026
Jan 2026
2.0 km away - Planning permissionAug 2025
1.1 km away - New homes
42 new homes completedhouses · Oct 2024 – Jul 2025
Jul 2025
1.9 km away - New homes
9 new homes completedflats · Mar 2025
Mar 2025
1.1 km away - Planning permission
Permission for 10 homesPublic House, East Of 9, Derby Road, Sandiacre, Derbyshire, NG10 5HW (full planning permission) Dec 2024
2.0 km away - Planning permissionDec 2024
1.0 km away - New homes
12 new homes completedhouses · Oct 2024 – Dec 2024
Dec 2024
1.3 km away
31homes extended 2021–2025, typically adding 27 m²
54since energy certificates began (2008)
0in NG10 4GE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
305hours of spills in 2025 between them (typical neighbourhood: about 36)
62spill events counted
- Severn Trent Water
Sandiacre - Mark Street (So)into River Erewash27 spills, 162 hours in 2025
1.5 km away - Severn Trent Water
Stapleford-Bessell Lane Wwtwinto Tributary Of River Erewash19 spills, 126 hours in 2025
1.4 km away - Severn Trent Water
Wilsthorpe Road Spsinto Golden Brook5 spills, 13 hours in 2025
1.6 km away - Severn Trent Water
Bennett Street Csointo River Erewash1 spills, 2 hours in 2025
500 m away - Severn Trent Water
Woodstock Road Csointo River Erewash8 spills, 1 hours in 2025
1.6 km away - Severn Trent Water
Portland Road/Carrfield Avenue Ssointo River Erewash2 spills, 1 hours in 2025
1.7 km away - Severn Trent Water
Breaston - Woodland Avenue (Cso) into Golden Brook0 spills, 0 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
50 planned, approved or being built and 9 running (17 MW between them). Those within 5 km are on the map above.
- Battery storage
Tamworth Road, Long Eaton - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
1.6 km away - Rooftop solar
George Spencer Academy, Arthur Mee Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
1.9 km away - Battery storage
Southfields Farm, Common Lane - Battery StorageApproved, not yet built · 130 MW
Aug 2024
3.2 km away - Energy from waste
EMERGE (East Midlands Energy Re-Generation)Approved, not yet built · 50 MW
Mar 2022
4.6 km away - Solar farm
Boyah Grange Solar Farm, Potato Pit Lane - Solar FarmPlanning application in · 35 MW
Aug 2025
5.0 km away - Rooftop solar
Crompton Road - Solar PanelsApproved, not yet built · 400 kW
May 2022
5.1 km away - Rooftop solar
Heart Internet, Beeston Business Park - Solar PanelsApproved, not yet built · 570 kW
Jan 2025
5.2 km away - Solar farm
Ratcliffe On Soar Power Station - Solar FarmApproved, not yet built · 9 MW
Jul 2023
5.2 km away - Rooftop solar
Donaldson Timber, Hallam Fields Road - Solar PanelsApproved, not yet built · 240 kW
Mar 2025
5.2 km away - Rooftop solar
JJ Foodservice, Lilac Grove - Solar PanelsPlanning application in · 400 kW
May 2026
5.9 km away
Road and street works within 1 km
11 permitted works running now or planned, 2 of them major.
- Major
Petersham Road, Long EatonHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
900 m away - Major
Wilsthorpe Road, Long EatonNew service connection · National Grid Electricity Distribution (East Midlands) · Road closure
Nov 2026 to Nov 2026
1000 m away - Standard
College Street, Long EatonUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Stop/go boards
Oct 2026 to Nov 2026
0 m away - Standard
William Street, Long EatonUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Some carriageway incursion
Nov 2026 to Nov 2026
50 m away - Standard
Cavendish Road, Long EatonUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Stop/go boards
Oct 2026 to Nov 2026
100 m away - Standard
Ingham Road, Long EatonUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Stop/go boards
Oct 2026 to Nov 2026
100 m away - Standard
Britannia Road, Long EatonUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Some carriageway incursion
Oct 2026 to Nov 2026
450 m away - Standard
Granville Avenue, Long EatonUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Stop/go boards
Oct 2026 to Oct 2026
450 m away - Standard
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
7.4 km away - RecommendationSept 2026
7.4 km away - RecommendationSept 2026
9.7 km away - Decideddecided Aug 2023
14.7 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
17.5 km away - Decideddecided Dec 2014
18.3 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 4.7 km); Beeston Weir Hydro Scheme (hydro, 5.1 km); Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels (rooftop solar, 5.6 km); East Midlands Distribution Centre (rooftop solar, 7.9 km); Willow Road - Roof mounted solar panels (rooftop solar, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.