What's changing near NG10 1GU
Within 2 km, around Long Eaton Town in Erewash. Building, planning, schools, transport, prices and crime.
173new homes completed within 2 km, last 2 years
169homes given permission on brownfield sites since 2021
+5.3%like-for-like prices in Long Eaton Town, 2024 → 2025 (council +2.7%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
76 new homes completed59 flats, 17 houses · Jul 2025 – Aug 2026
Aug 2026
1.5 km away - New homes
24 new homes completedhouses · Apr 2025 – Aug 2026
Aug 2026
1.6 km away - New homes
42 new homes completedhouses · Oct 2024 – Jul 2025
Jul 2025
250 m away - New homes
9 new homes completedflats · Mar 2025
Mar 2025
700 m away - Planning permissionDec 2024
750 m away - Planning permission
Permission for 9 homesformer Wilko offices, 56-58 Market Place, Long Eaton, Derbyshire, NG10 1LJ (full planning permission) Jun 2024
750 m away - Planning permissionMay 2024
300 m away - Planning permission
Permission for 7 homesHole In The Wall, 6 Regent Street, Long Eaton, Derbyshire, NG10 1JX (full planning permission) Mar 2024
750 m away - Planning permission
12homes extended 2021–2025, typically adding 26 m²
25since energy certificates began (2008)
1in NG10 1GU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
246hours of spills in 2025 between them (typical neighbourhood: about 36)
35spill events counted
- Severn Trent Water
Toton Wastewater Treatment Worksinto River Erewash24 spills, 242 hours in 2025
1.4 km away - Severn Trent Water
Bennett Street Csointo River Erewash1 spills, 2 hours in 2025
1.5 km away - Severn Trent Water
Woodstock Road Csointo River Erewash8 spills, 1 hours in 2025
1.2 km away - Severn Trent Water
Portland Road/Carrfield Avenue Ssointo River Erewash2 spills, 1 hours in 2025
1.2 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
53 planned, approved or being built and 9 running (17 MW between them). Those within 5 km are on the map above.
- Battery storage
Tamworth Road, Long Eaton - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
600 m away - Energy from waste
EMERGE (East Midlands Energy Re-Generation)Approved, not yet built · 50 MW
Mar 2022
2.9 km away - Rooftop solar
George Spencer Academy, Arthur Mee Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
3.0 km away - Solar farm
Ratcliffe On Soar Power Station - Solar FarmApproved, not yet built · 9 MW
Jul 2023
3.6 km away - Battery storage
Southfields Farm, Common Lane - Battery StorageApproved, not yet built · 130 MW
Aug 2024
3.8 km away - Rooftop solar
Heart Internet, Beeston Business Park - Solar PanelsApproved, not yet built · 570 kW
Jan 2025
4.7 km away - Battery storage
Gotham - Battery Energy storagePlanning application in · 100 MW
May 2024
4.9 km away - Battery storage
Remembrance Way - Battery Energy Storage SystemApproved, not yet built · 99 MW
Jan 2026
5.3 km away - Solar farm
Church Farm, Kingston On Soar - Solar Photovoltaic FarmApproved, not yet built · 50 MW
Dec 2022
5.4 km away - Rooftop solar
JJ Foodservice, Lilac Grove - Solar PanelsPlanning application in · 400 kW
May 2026
5.4 km away
Road and street works within 1 km
19 permitted works running now or planned, 6 of them major.
- Major
Main Street, Long EatonWorks for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026
200 m away - Major
Station Street, Long EatonWorks for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026
250 m away - Major, planned
Beaconsfield Street, Long EatonHighway improvement works · DERBYSHIRE COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Nov 2026
350 m away - Major
Market Place, Long EatonHighway improvement works · DERBYSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
500 m away - Major, planned
Station Road, Long EatonUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Feb 2027 to Feb 2027
550 m away - Major
Acton Close, Long EatonHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Feb 2027
600 m away - Standard
Leicester Street, Long EatonHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Standard
Oakleys Road, Long EatonHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
400 m away - Standard
Peel Street, Long EatonHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Multi-way signals
Mar 2027 to Mar 2027
400 m away
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
6.4 km away - RecommendationSept 2026
6.4 km away - RecommendationSept 2026
8.8 km away - Decideddecided Aug 2023
16.2 km away - Decideddecided Dec 2014
19.1 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
19.3 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels (rooftop solar, 4.1 km); Beeston Weir Hydro Scheme (hydro, 4.3 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 6.2 km); Land at Whatton Road (solar farm, 7.5 km); East Midlands Distribution Centre (rooftop solar, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.