Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
246hours of spills in 2025 between them (typical neighbourhood: about 36)
35spill events counted
Severn Trent Water
Toton Wastewater Treatment Worksinto River Erewash24 spills, 242 hours in 2025
1.6 km away
Severn Trent Water
Bennett Street Csointo River Erewash1 spills, 2 hours in 2025
1.5 km away
Severn Trent Water
Woodstock Road Csointo River Erewash8 spills, 1 hours in 2025
1.3 km away
Severn Trent Water
Portland Road/Carrfield Avenue Ssointo River Erewash2 spills, 1 hours in 2025
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Permission for 7 homes29 Beaconsfield Street, Long Eaton, Derbyshire, NG10 1AY (full planning permission)
Sept 2021 350 m away
Planning permission
Permission for 7 homes29 Beaconsfield Street (Gymnasium), Long Eaton, Derbyshire, NG10 1AY (full planning permission)
Feb 2021 450 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Crompton Road - Solar PanelsApproved, not yet built · 400 kW
May 2022 6.7 km away
Solar farm
Boyah Grange Solar Farm, Potato Pit Lane - Solar FarmPlanning application in · 35 MW
Aug 2025 6.7 km away
Running nearest: Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels (rooftop solar, 4.3 km); Beeston Weir Hydro Scheme (hydro, 4.5 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 6.2 km); Land at Whatton Road (solar farm, 7.4 km); East Midlands Distribution Centre (rooftop solar, 7.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
Tamworth Road, Long EatonHighway improvement works · DERBYSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 450 m away
Standard
Peel Street, Long EatonHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Multi-way signals
Mar 2027 to Mar 2027 450 m away
Standard
Peel Street, Long EatonHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Mar 2027 to Mar 2027 500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 19.5 km away
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
application due March 2028 23.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.