Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
390hours of spills in 2025 between them (typical neighbourhood: about 36)
64spill events counted
Northumbrian Water
Newbiggin Sewage Treatment Worksinto North Sea · near bathing water: Newbiggin North; Newbiggin South61 spills, 387 hours in 2025
900 m away
Northumbrian Water
Newbiggin Sso (Wilkie Terrace)into North Sea3 spills, 4 hours in 2025
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Optional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 100 m away
Minor
Long Park, Newbiggin-By-The-SeaHighway repair and maintenance works · NORTHUMBERLAND COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 600 m away
Minor
Front Street, Newbiggin-By-The-SeaOptional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Two-way signals
Jan 2027 to Jan 2027 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided Jan 2021 30.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.