Country England and Wales › Region North East › Council Northumberland › Neighbourhood Newbiggin › Postcode NE64 6TQ What's changing near NE64 6TQ Within 2 km, around Newbiggin in Northumberland. Building, planning, schools, transport, prices and crime.
285 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.4% like-for-like prices in Newbiggin, 2024 → 2025 (council +3.7%)
-4% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 22 new homes completed houses · Oct 2025 – Oct 2026
Oct 2026 800 m away New homes 20 new homes completed houses · Jun 2026 – Sep 2026
Sept 2026 950 m away New homes 16 new homes completed houses · Nov 2025 – Sep 2026
Sept 2026 700 m away New homes 11 new homes completed houses · May 2026 – Jul 2026
Jul 2026 800 m away New homes 43 new homes completed houses · Nov 2024 – Jun 2026
Jun 2026 1.0 km away New homes 13 new homes completed houses · Oct 2025 – Jun 2026
Jun 2026 800 m away New homes 13 new homes completed houses · Dec 2025 – May 2026
May 2026 700 m away New homes 25 new homes completed houses · Oct 2025 – May 2026
May 2026 850 m away New homes 20 new homes completed houses · Nov 2024 – May 2026
May 2026 950 m away New homes 12 new homes completed houses · Nov 2025 – Apr 2026
Apr 2026 900 m away New homes 15 new homes completed houses · Aug 2025
Aug 2025 1.4 km away New homes 45 new homes completed houses · Nov 2024 – Jun 2025
Jun 2025 1.1 km away 3 homes extended 2021–2025, typically adding 19 m²
9 since energy certificates began (2008)
1 in NE64 6TQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
390 hours of spills in 2025 between them (typical neighbourhood: about 36)
64 spill events counted
Northumbrian Water Newbiggin Sewage Treatment Works into North Sea · near bathing water: Newbiggin North; Newbiggin South 61 spills, 387 hours in 2025
1.3 km away Northumbrian Water Newbiggin Sso (Wilkie Terrace) into North Sea 3 spills, 4 hours in 2025
1.4 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 15 planned, approved or being built and 8 running (465 MW between them). Those within 5 km are on the map above.
Rooftop solar Lynx Precast, Lynefield Park - Solar PV Panels Approved, not yet built · 490 kW
Dec 2025 2.2 km away Rooftop solar Ashington Leisure Centre - Solar Panels Approved, not yet built · 220 kW
Dec 2024 2.8 km away Battery storage West Sleekburn - Battery Storage Compound Approved, not yet built · 30 MW
Oct 2022 2.8 km away Solar farm Ellington South Site, Lynemouth Solar Array Approved, not yet built · 1 MW
Mar 2023 3.0 km away Battery storage High Brockland Farm, Brock Lane - Battery Energy Storage System Approved, not yet built · 70 MW
Jan 2026 3.2 km away Anaerobic digestion Ellington Road - Anaerobic Digestion Facility Approved, not yet built
Jul 2023 4.3 km away Wind farm East Sleekburn - Wind Farm Approved, not yet built
Nov 2024 4.5 km away Rooftop solar Factory C, Coniston Road - Roof repairs & PV Array Planning application in
Jun 2023 5.5 km away Rooftop solar Blyth Academy, Chase Farm Drive - Solar Panels Approved, not yet built · 610 kW
Nov 2025 6.6 km away Rooftop solar Bede Academy North, Sixth Avenue - Solar PV Panels Approved, not yet built · 450 kW
Dec 2025 7.0 km away Road and street works within 1 km 10 permitted works running now or planned, 6 of them major.
Major, planned Collingwood Road Back Lane, Newbiggin-By-The-Sea Works for road purposes · NORTHUMBERLAND COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 650 m away Major, planned Woodhorn Road To Collingwood Road, Newbiggin-By-The-Sea Works for road purposes · NORTHUMBERLAND COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 800 m away Major Woodhorn Road, Newbiggin-By-The-Sea Utility asset works · NORTHUMBRIAN WATER · Two-way signals
Oct 2026 to Oct 2026 900 m away Major, planned Woodhorn Road, Newbiggin-By-The-Sea Utility asset works · NORTHUMBRIAN WATER · Two-way signals
Oct 2026 to Oct 2026 900 m away Major, planned Front Street Back Lane, Newbiggin-By-The-Sea Highway repair and maintenance works · NORTHUMBRIAN WATER · Road closure
Jan 2027 to Jan 2027 1000 m away Major, planned Woodhorn Lane, Newbiggin-By-The-Sea Highway repair and maintenance works · NORTHUMBRIAN WATER · Road closure
Jan 2027 to Jan 2027 1000 m away Standard Spital Road, Newbiggin-By-The-Sea Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Oct 2026 to Oct 2026 100 m away Standard Northumberland Avenue, Newbiggin-By-The-Sea Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Oct 2026 to Oct 2026 450 m away Minor North Seaton Road Back Lane, Newbiggin-By-The-Sea
Major infrastructure projects within 30 km Decided decided Jul 2013 4.8 km away Decided decided Jan 2015 10.9 km away Decided decided May 2024 18.7 km away Decided decided Jan 2016 19.2 km away Decided decided Sept 2018 26.8 km away Decided decided Jul 2020 27.7 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lynemouth Windfarm (Resubmission) (wind farm, 2.5 km); Lynemouth Power Station (biomass, 2.9 km); Bewick Drift (wind farm, 4.3 km); Blyth Sewage Treatment Works (solar farm, 5.4 km); Blyth Harbour Wind Farm (re-power) (wind farm, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.