Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
380hours of spills in 2025 between them (typical neighbourhood: about 36)
122spill events counted
Northumbrian Water
Seaton North Hotel Cso (Wk013)into Rowlington Burn(R Wansbeck)43 spills, 169 hours in 2025
1.1 km away
Northumbrian Water
Ashington Cso Park Road Wk 006into Blackclose Burn (R.Wansbeck)24 spills, 151 hours in 2025
1.9 km away
Northumbrian Water
Glaxo West Csointo River Wansbeck (Saline Estuar)23 spills, 22 hours in 2025
1.4 km away
Northumbrian Water
North Seaton Level Crossing Csointo River Wansbeck(Saline Estuary)3 spills, 16 hours in 2025
1.5 km away
Northumbrian Water
Lyndhurst Road Csointo River Wansbeck · near bathing water: Newbiggin North; Newbiggin South14 spills, 14 hours in 2025
1.2 km away
Northumbrian Water
Green Lane Cso 9(Wk 008)into Wansbeck, Tributary Of6 spills, 7 hours in 2025
1.7 km away
Northumbrian Water
Park Road & Green Lane Csointo Wansbeck, Tributary Of5 spills, 1 hours in 2025
1.9 km away
Northumbrian Water
South Green Lane Csointo Blackclose Dene4 spills, 1 hours in 2025
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Utility repair and maintenance works · NORTHERN GAS NETWORKS · No carriageway incursion
Oct 2026 to Oct 2026 950 m away
Minor
Alexandra Road To Fairfield Drive, AshingtonSection 50 · NORTHUMBERLAND COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided Jan 2021 29.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.