Country England and Wales › Region North East › Council Northumberland › Neighbourhood Ashington West & South › Postcode NE63 8NE What's changing near NE63 8NE Within 2 km, around Ashington West & South in Northumberland. Building, planning, schools, transport, prices and crime.
6 new homes completed within 2 km, last 2 years
18 homes given permission on brownfield sites since 2021
+6.9% like-for-like prices in Ashington West & South, 2024 → 2025 (council +3.7%)
-24% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first Planning permission Jul 2024 50 m away Planning permission Apr 2024 1.3 km away Planning permission Jun 2022 1.3 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
7 homes extended 2021–2025, typically adding 22 m²
19 since energy certificates began (2008)
1 in NE63 8NE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 6 storm overflows within 2 km
161 hours of spills in 2025 between them (typical neighbourhood: about 36)
46 spill events counted
Northumbrian Water Ashington Cso Park Road Wk 006 into Blackclose Burn (R.Wansbeck) 24 spills, 151 hours in 2025
1.5 km away Northumbrian Water Green Lane Cso 9(Wk 008) into Wansbeck, Tributary Of 6 spills, 7 hours in 2025
1.7 km away Northumbrian Water Ashington Drive Cso Hlf Moon Rndbwt into Wansbeck Estuary 6 spills, 2 hours in 2025
1.8 km away Northumbrian Water Park Road & Green Lane Cso into Wansbeck, Tributary Of 5 spills, 1 hours in 2025
1.5 km away Northumbrian Water South Green Lane Cso into Blackclose Dene 4 spills, 1 hours in 2025
1.7 km away Northumbrian Water Bothal Cottages into Unnamed Trib Of R Wansbeck 1 spills, 0 hours in 2025
1000 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 22 planned, approved or being built and 13 running (517 MW between them). Those within 5 km are on the map above.
Rooftop solar Ashington Leisure Centre - Solar Panels Approved, not yet built · 220 kW
Dec 2024 1.4 km away Anaerobic digestion Ellington Road - Anaerobic Digestion Facility Approved, not yet built
Jul 2023 1.9 km away Rooftop solar Lynx Precast, Lynefield Park - Solar PV Panels Approved, not yet built · 490 kW
Dec 2025 3.9 km away Battery storage High Brockland Farm, Brock Lane - Battery Energy Storage System Approved, not yet built · 70 MW
Jan 2026 3.9 km away Battery storage West Sleekburn - Battery Storage Compound Approved, not yet built · 30 MW
Oct 2022 4.1 km away Solar farm Ellington South Site, Lynemouth Solar Array Approved, not yet built · 1 MW
Mar 2023 5.0 km away Wind farm East Sleekburn - Wind Farm Approved, not yet built
Nov 2024 5.1 km away Battery storage Burnt House Farm, Nedderton Village - Battery Energy Storage System Planning application in · 50 MW
Apr 2025 5.4 km away Solar farm Burnt House Farm - Solar Farm Approved, not yet built · 50 MW
Nov 2022 5.4 km away Rooftop solar Factory C, Coniston Road - Roof repairs & PV Array Planning application in
Jun 2023 6.4 km away Road and street works within 1 km 3 permitted works running now or planned.
Standard Devon Close, Ashington Utility repair and maintenance works · NORTHUMBRIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away Minor Rotary Parkway, Ashington Works for road purposes · NORTHUMBERLAND COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 650 m away Minor Wansbeck Business Park, Ashington Works for road purposes · NORTHUMBERLAND COUNTY COUNCIL · No carriageway incursion
Nov 2026 to Nov 2026 650 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jan 2015 6.7 km away Decided decided Jul 2013 6.9 km away Decided decided May 2024 16.0 km away Decided decided Jan 2016 20.3 km away Decided decided Sept 2018 27.9 km away Decided decided Jul 2020 28.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: North East Grains Site (anaerobic digestion, 2.9 km); Lynemouth Windfarm (Resubmission) (wind farm, 3.8 km); Bewick Drift (wind farm, 4.1 km); Lynemouth Power Station (biomass, 4.5 km); Blyth Sewage Treatment Works (solar farm, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.