Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
404hours of spills in 2025 between them (typical neighbourhood: about 36)
139spill events counted
Northumbrian Water
Seaton North Hotel Cso (Wk013)into Rowlington Burn(R Wansbeck)43 spills, 169 hours in 2025
1.1 km away
Northumbrian Water
Ashington Cso Park Road Wk 006into Blackclose Burn (R.Wansbeck)24 spills, 151 hours in 2025
1.2 km away
Northumbrian Water
East Ford Road Ps Emergency Overflointo River Wansbeck11 spills, 23 hours in 2025
1.6 km away
Northumbrian Water
Glaxo West Csointo River Wansbeck (Saline Estuar)23 spills, 22 hours in 2025
2.0 km away
Northumbrian Water
North Seaton Level Crossing Csointo River Wansbeck(Saline Estuary)3 spills, 16 hours in 2025
1.3 km away
Northumbrian Water
Lyndhurst Road Csointo River Wansbeck · near bathing water: Newbiggin North; Newbiggin South14 spills, 14 hours in 2025
1.8 km away
Northumbrian Water
Green Lane Cso 9(Wk 008)into Wansbeck, Tributary Of6 spills, 7 hours in 2025
Permission for 25 homesFormer St Aidans Rc First School Norham Road Ashington (full planning permission)
Apr 2021 800 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 25 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Blyth Academy, Chase Farm Drive - Solar PanelsApproved, not yet built · 610 kW
Nov 2025 6.2 km away
Solar farm
Broadway House Farm Solar FarmApproved, not yet built · 50 MW
Nov 2023 6.3 km away
Running nearest: Lynemouth Windfarm (Resubmission) (wind farm, 2.9 km); Lynemouth Power Station (biomass, 3.7 km); Bewick Drift (wind farm, 4.2 km); North East Grains Site (anaerobic digestion, 5.0 km); Blyth Sewage Treatment Works (solar farm, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Utility repair and maintenance works · NORTHERN GAS NETWORKS · Two-way signals
Sept 2026 to Nov 2026 300 m away
Major, planned
Milburn Road, AshingtonWorks for road purposes · NORTHUMBERLAND COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026 350 m away
Major, planned
Third Avenue, AshingtonWorks for road purposes · NORTHUMBERLAND COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026 350 m away
Major
Rowlington Terrace, AshingtonUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided Jan 2021 29.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.