Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
34hours of spills in 2025 between them (typical neighbourhood: about 36)
56spill events counted
Northumbrian Water
Point A Damside Cso Cm022into Cotting Burn22 spills, 22 hours in 2025
1.4 km away
Northumbrian Water
Sunn Inn Csointo Church Burn17 spills, 8 hours in 2025
1.8 km away
Northumbrian Water
Point M St James Church Csointo Cotting Burn6 spills, 2 hours in 2025
900 m away
Northumbrian Water
Storey Park Csointo Church Burn4 spills, 2 hours in 2025
1.8 km away
Northumbrian Water
Damside And Staithes Lane Csointo The Cotting Burn2 spills, 1 hours in 2025
1.4 km away
Northumbrian Water
Bennetts Walk Csointo River Wansbeck4 spills, 0 hours in 2025
1.6 km away
Northumbrian Water
Morpeth Cso Dinto Wansbeck0 spills, 0 hours in 2025
1.6 km away
Northumbrian Water
Elder Cottages Csointo Church Burn0 spills, 0 hours in 2025
Ray II Wind FarmGenerating Stations · Ray II Wind Farm project is located in Northumberland, adjacent (north) to the existing
Ray Wind Farm, approximately 1 km south of Raylees.
Permission for 6 homesLand North Of Katerdene, Fulbeck, Morpeth (full planning permission)
Aug 2024 900 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 25 postcodes nearby had new homes completed in the last two years.
Battery storage
High Brockland Farm, Brock Lane - Battery Energy Storage SystemApproved, not yet built · 70 MW
Jan 2026 9.9 km away
Running nearest: County Hall, Loansdean - Solar Array (solar farm, 2.8 km); County Hall, Loansdean - Battery Storage (battery storage, 2.8 km); North East Grains Site (anaerobic digestion, 4.9 km); MSD Cramlington (wind farm, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · The scheme is located on the A1 Newcastle Gateshead Western Bypass, between junctions 65 and 67.
decided Jan 2021 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.