Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
400hours of spills in 2025 between them (typical neighbourhood: about 36)
137spill events counted
Northumbrian Water
Morpeth Stwinto River Wansbeck18 spills, 174 hours in 2025
1.9 km away
Northumbrian Water
Stobs Ford Spsinto River Wansbeck48 spills, 164 hours in 2025
1.9 km away
Northumbrian Water
Morpeth Stwinto River Wansbeck15 spills, 28 hours in 2025
1.9 km away
Northumbrian Water
Point A Damside Cso Cm022into Cotting Burn22 spills, 22 hours in 2025
1.4 km away
Northumbrian Water
Sunn Inn Csointo Church Burn17 spills, 8 hours in 2025
500 m away
Northumbrian Water
Point M St James Church Csointo Cotting Burn6 spills, 2 hours in 2025
1.4 km away
Northumbrian Water
Storey Park Csointo Church Burn4 spills, 2 hours in 2025
500 m away
Northumbrian Water
Damside And Staithes Lane Csointo The Cotting Burn2 spills, 1 hours in 2025
Ray II Wind FarmGenerating Stations · Ray II Wind Farm project is located in Northumberland, adjacent (north) to the existing
Ray Wind Farm, approximately 1 km south of Raylees.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.