Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
405hours of spills in 2025 between them (typical neighbourhood: about 36)
89spill events counted
Northumbrian Water
Haydon Bridge Stwinto River South Tyne25 spills, 200 hours in 2025
1.2 km away
Northumbrian Water
Temple House Sewage Pumping Stationinto Langley Burn27 spills, 113 hours in 2025
650 m away
Northumbrian Water
The Old Vicarage Csointo River South Tyne37 spills, 91 hours in 2025
7 planned, approved or being built and 0 running. Those within 5 km are on the map above.
Solar farm
Fourstones - Solar ParkPlanning application in · 50 MW
Aug 2025 6.7 km away
Battery storage
Fourstones -Battery Energy StoragePlanning application in · 60 MW
Aug 2025 6.7 km away
Solar farm
Fourstones Substation, Fourstones - Solar Farm & Battery Energy StoragePlanning application in · 32 MW
May 2025 7.4 km away
Battery storage
Fourstones Substation, Fourstones - Solar Farm & Battery Energy StoragePlanning application in
May 2025 7.4 km away
Solar farm
Acomb Village, Acomb - Solar PanelsApproved, not yet built · 990 kW
Dec 2025 9.2 km away
Rooftop solar
Halfway House, Lincoln Hill - Solar ArrayApproved, not yet built · 1 MW
Jul 2023 9.9 km away
Battery storage
Halfway House, Lincoln Hill - Energy StorageApproved, not yet built · 3 MW
Jul 2023 9.9 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
Major, planned
U8239 Greenwich Gardens Footway, Haydon BridgeUtility asset works · BT · No carriageway incursion
Dec 2026 to Dec 2026 200 m away
Major, planned
U8239 Langley Gardens Footway, Haydon BridgeUtility asset works · BT · Give and take
Dec 2026 to Dec 2026 300 m away
Major, planned
U8239 Langley Gardens Greenwich Gardens Footway, Haydon BridgeUtility asset works · BT · Give and take
Dec 2026 to Dec 2026 300 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Ray II Wind FarmGenerating Stations · Ray II Wind Farm project is located in Northumberland, adjacent (north) to the existing
Ray Wind Farm, approximately 1 km south of Raylees.
application due June 2027 26.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Haydon Bridge & Allendale: +37% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.0% in two years.