Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
93hours of spills in 2025 between them (typical neighbourhood: about 36)
67spill events counted
Northumbrian Water
Well Bank Cso Td008into River Tyne40 spills, 68 hours in 2025
650 m away
Northumbrian Water
Station Road Csointo Tyne4 spills, 22 hours in 2025
900 m away
Northumbrian Water
Bridge End Cottages Csointo River Tyne9 spills, 2 hours in 2025
750 m away
Northumbrian Water
St Helens Lane Csointo River Tyne12 spills, 2 hours in 2025
650 m away
Northumbrian Water
Cso Outside Milkwell Cottagesinto River Tyne2 spills, 0 hours in 2025
750 m away
Northumbrian Water
Princes/Woodbine(St Helens St.)Csointo Tyne0 spills, 0 hours in 2025
550 m away
Northumbrian Water
Springfield Cottages Csointo River Tyne0 spills, 0 hours in 2025
1 planned, approved or being built and 1 running (2 MW between them). Those within 5 km are on the map above.
Solar farm
Acomb Village, Acomb - Solar PanelsApproved, not yet built · 990 kW
Dec 2025 6.2 km away
Running nearest: Land South East Of Water Treatment Works Bridge End (anaerobic digestion, 4.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
Major
Princes Street, CorbridgePermanent reinstatement · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Oct 2026 550 m away
Standard
St Helens Lane, CorbridgeUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Give and take
Oct 2026 to Nov 2026 250 m away
Standard
Stagshaw Road, CorbridgeUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Some carriageway incursion
Oct 2026 to Nov 2026 300 m away
Standard
Aydon Road, CorbridgeUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Feb 2027 to Feb 2027 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Ray II Wind FarmGenerating Stations · Ray II Wind Farm project is located in Northumberland, adjacent (north) to the existing
Ray Wind Farm, approximately 1 km south of Raylees.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Stocksfield, Riding Mill & Corbridge: +22% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.7% in two years.