Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
135hours of spills in 2025 between them (typical neighbourhood: about 36)
Ray II Wind FarmGenerating Stations · Ray II Wind Farm project is located in Northumberland, adjacent (north) to the existing
Ray Wind Farm, approximately 1 km south of Raylees.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Prudhoe: +20% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.1% in two years.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Dec 2026 to Feb 2027 800 m away
Major, planned
Nunnykirk Close, OvinghamUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Feb 2027 850 m away
Major, planned
U8256 Denegarth Footpath, OvinghamUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Dec 2026 to Jan 2027 950 m away
Major, planned
Dene Garth, OvinghamUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Dec 2026 to Jan 2027 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
application due June 2027 29.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.