Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
205hours of spills in 2025 between them (typical neighbourhood: about 36)
Ray II Wind FarmGenerating Stations · Ray II Wind Farm project is located in Northumberland, adjacent (north) to the existing
Ray Wind Farm, approximately 1 km south of Raylees.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Utility repair and maintenance works · BT · No carriageway incursion
Oct 2026 to Oct 2026 200 m away
Major, planned
U8256 Denegarth Footpath, OvinghamUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Dec 2026 to Jan 2027 200 m away
Major, planned
C254 West Road To Hill Crest, OvinghamUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Feb 2027 to Mar 2027 200 m away
Major, planned
West Road, OvinghamUtility repair and maintenance works · NORTHERN GAS NETWORKS · Two-way signals
Feb 2027 to Mar 2027 300 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · Port Blyth in Northumberland
decided Jul 2013 29.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.