What's changing near NE37 3LW
Within 2 km, around Springwell & Usworth in Sunderland. Building, planning, schools, transport, prices and crime.
103new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.9%like-for-like prices in Springwell & Usworth, 2024 → 2025 (council +3.9%)
-10%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
51 new homes completedhouses · Jan 2025 – Sep 2026
Sept 2026
750 m away - New homes
41 new homes completedhouses · Mar 2025 – Jun 2026
Jun 2026
1.9 km away - New homes
6 new homes completedhouses · Oct 2025 – May 2026
May 2026
800 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
1homes extended 2021–2025, typically adding 15 m²
3since energy certificates began (2008)
0in NE37 3LW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
70hours of spills in 2025 between them (typical neighbourhood: about 36)
32spill events counted
- Northumbrian Water
Coach Road Est Csointo Usworth Burn20 spills, 59 hours in 2025
750 m away - Northumbrian Water
Manor Road Csointo Don10 spills, 11 hours in 2025
1.1 km away - Northumbrian Water
Usworth Hall Csointo Don, Tributary Of1 spills, 0 hours in 2025
100 m away - Northumbrian Water
Grassbanks Csointo Don1 spills, 0 hours in 2025
1.3 km away - Northumbrian Water
Sheraton Csointo Don0 spills, 0 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
86 planned, approved or being built and 12 running (63 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Stephenson Industrial Estate, Rutherford Road - Solar PanelsApproved, not yet built · 210 kW
Mar 2026
500 m away - Rooftop solar
Snop, Rainhill Road - Solar PanelsApproved, not yet built · 1 MW
Sept 2023
600 m away - Battery storage
Stephenson Road - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2025
800 m away - Rooftop solar
NCL1, Follingsby Lane - Solar PanelsApproved, not yet built · 4 MW
Apr 2023
1.5 km away - Rooftop solar
Vantec, Turbine Way - Solar PanelsApproved, not yet built · 320 kW
Jun 2023
1.7 km away - Rooftop solar
Encore Envelopes Limited, Industrial Road - Solar PanelsApproved, not yet built · 510 kW
Dec 2023
1.7 km away - Rooftop solar
Spire Road - Solar ArrayApproved, not yet built · 250 kW
Mar 2022
1.8 km away - Battery storage
AESC UK, Giga Factories, Plot 2 - Plant 3, Warehouse, Office & Sub-stationsApproved, not yet built
Apr 2026
1.9 km away - Rooftop solar
Vantec, Infiniti Drive - Solar PanelsApproved, not yet built · 300 kW
Jun 2023
1.9 km away - Rooftop solar
SNOP UK, Washington Road - Solar PanelsApproved, not yet built · 1 MW
Mar 2026
2.0 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Sept 2018
3.0 km away - Decideddecided Jul 2020
3.1 km away - Decideddecided Jan 2021
5.4 km away - Decideddecided Jan 2016
9.5 km away - Decideddecided Jul 2013
23.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Unipres building (rooftop solar, 1.7 km); Nissan Wind Farm (wind farm, 2.2 km); Nissan Motors Plant Extn (wind farm, 2.2 km); Nissan Test Track (solar farm, 2.7 km); PG4 St Bedes Power Generation (Extension 2) (landfill gas, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.