Country England and Wales › Region North East › Council South Tyneside › Neighbourhood Cleadon Park › Postcode NE34 8PP What's changing near NE34 8PP Within 2 km, around Cleadon Park in South Tyneside. Building, planning, schools, transport, prices and crime.
0 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.4% like-for-like prices in Cleadon Park, 2024 → 2025 (council +3.6%)
-13% recorded crime, last 12 months vs the 12 before
On the map
School opened School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 32 m²
16 since energy certificates began (2008)
0 in NE34 8PP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 57 planned, approved or being built and 7 running (82 MW between them). Those within 5 km are on the map above.
Rooftop solar Mortimer community college, Reading Road - Solar Panels Approved, not yet built · 320 kW
Nov 2025 1.6 km away Rooftop solar Middlefields Depot, Middlefields Industrial Estate - Solar Panels Approved, not yet built · 520 kW
Feb 2026 2.0 km away Rooftop solar Merchant House Warehouse, Tyne Dock - Solar Photovoltaics Equipment Approved, not yet built · 690 kW
Nov 2023 2.4 km away Battery storage Port Of Tyne, Tyne Dock - Battery Storage Planning application in
Jul 2022 2.7 km away Rooftop solar Westoe Crown Primary School, Sea Winnings Way - Solar Panels Approved, not yet built · 200 kW
Nov 2025 3.0 km away Rooftop solar UTS Engineering, Pilgrimsway - Solar Panels Approved, not yet built
Oct 2025 3.1 km away Solar farm E/o the Academy Of Light, Sunderland Road - Solar Farm Planning application in · 40 MW
Jul 2024 3.3 km away Rooftop solar Simonside Industrial Unit, Shaftesbury Avenue - Solar Panels Approved, not yet built · 360 kW
Oct 2024 3.4 km away Rooftop solar Dunes Amusement Arcade, Sea Road - Solar Panels Approved, not yet built · 150 kW
Mar 2026 3.5 km away Rooftop solar Border Control Post, Coble Dene - Solar Panels Approved, not yet built · 250 kW
Sept 2025 3.5 km away Road and street works within 1 km 28 permitted works running now or planned, 25 of them major.
Major Rear Of Borough Road And Prince Edward Road, South Shields Utility asset works · BT · Road closure
Oct 2026 to Oct 2026 550 m away Major, planned St Marys Avenue, South Shields Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Jan 2027 550 m away Major, planned South Close, South Shields Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Jan 2027 650 m away Major, planned St Marys Avenue, South Shields Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Feb 2027 to Mar 2027 650 m away Major, planned Borough Road, South Shields Utility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Nov 2026 to Feb 2027 700 m away Major, planned North Close, South Shields Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Feb 2027 to Mar 2027 700 m away Major, planned Gloucester Place, South Shields Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Feb 2027 700 m away Major, planned Kent Place, South Shields Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Feb 2027 750 m away Major, planned York Way, South Shields
Major infrastructure projects within 30 km Decided decided Sept 2018 4.8 km away Decided decided Jul 2020 5.0 km away Decided decided Jan 2016 6.9 km away Decided decided Jan 2021 12.8 km away Decided decided Jul 2013 19.9 km away Decided decided Jan 2015 29.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Port of Tyne (battery storage, 2.7 km); Howdon STW (other, 4.4 km); Nissan Test Track (solar farm, 6.3 km); Unipres building (rooftop solar, 7.2 km); Nissan Wind Farm (wind farm, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.