Country England and Wales › Region North East › Council South Tyneside › Neighbourhood West Park › Postcode NE34 0HU What's changing near NE34 0HU Within 2 km, around West Park in South Tyneside. Building, planning, schools, transport, prices and crime.
66 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.5% like-for-like prices in West Park, 2024 → 2025 (council +3.6%)
-16% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 49 new homes completed houses · Feb 2025 – Oct 2025
Oct 2025 1.4 km away New homes 17 new homes completed houses · Oct 2024 – Jan 2025
Jan 2025 1.4 km away New school Sept 2022 650 m away School closed School closed: South Shields School Community school, secondary (closure)
Aug 2020 1.2 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
5 homes extended 2021–2025, typically adding 24 m²
12 since energy certificates began (2008)
2 in NE34 0HU itself
Extended certificate 2023 Extended certificate 2023 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 60 planned, approved or being built and 7 running (82 MW between them). Those within 5 km are on the map above.
Rooftop solar Mortimer community college, Reading Road - Solar Panels Approved, not yet built · 320 kW
Nov 2025 1.1 km away Rooftop solar Middlefields Depot, Middlefields Industrial Estate - Solar Panels Approved, not yet built · 520 kW
Feb 2026 1.3 km away Rooftop solar Merchant House Warehouse, Tyne Dock - Solar Photovoltaics Equipment Approved, not yet built · 690 kW
Nov 2023 1.7 km away Battery storage Port Of Tyne, Tyne Dock - Battery Storage Planning application in
Jul 2022 2.0 km away Rooftop solar UTS Engineering, Pilgrimsway - Solar Panels Approved, not yet built
Oct 2025 2.4 km away Rooftop solar Westoe Crown Primary School, Sea Winnings Way - Solar Panels Approved, not yet built · 200 kW
Nov 2025 2.7 km away Rooftop solar Simonside Industrial Unit, Shaftesbury Avenue - Solar Panels Approved, not yet built · 360 kW
Oct 2024 2.7 km away Rooftop solar Border Control Post, Coble Dene - Solar Panels Approved, not yet built · 250 kW
Sept 2025 2.9 km away Battery storage Church Bank - Battery Storage System Planning application in · 100 MW
Sept 2025 3.1 km away Rooftop solar Dunes Amusement Arcade, Sea Road - Solar Panels Approved, not yet built · 150 kW
Mar 2026 3.2 km away Road and street works within 1 km 5 permitted works running now or planned, 3 of them major.
Major, planned Moor Lane, South Shields Highway repair and maintenance works · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026 750 m away Major Moor Lane, South Shields Highway repair and maintenance works · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026 750 m away Major, planned West Avenue, South Shields Highway repair and maintenance works · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026 750 m away Standard Bamford Walk, South Shields New service connection · NORTHERN GAS NETWORKS · No carriageway incursion
Oct 2026 to Oct 2026 50 m away Minor Harton Lane, South Shields Optional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Two-way signals
Nov 2026 to Nov 2026 400 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2018 4.6 km away Decided decided Jul 2020 4.9 km away Decided decided Jan 2016 6.2 km away Decided decided Jan 2021 12.4 km away Decided decided Jul 2013 19.4 km away Decided decided Jan 2015 29.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Port of Tyne (battery storage, 2.0 km); Howdon STW (other, 4.0 km); Nissan Test Track (solar farm, 6.3 km); Unipres building (rooftop solar, 7.1 km); Nissan Wind Farm (wind farm, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.