Country England and Wales › Region North East › Council South Tyneside › Neighbourhood South Shields East › Postcode NE33 2DP What's changing near NE33 2DP Within 2 km, around South Shields East in South Tyneside. Building, planning, schools, transport, prices and crime.
103 new homes completed within 2 km, last 2 years
422 homes given permission on brownfield sites since 2021
+5.8% like-for-like prices in South Shields East, 2024 → 2025 (council +3.6%)
-22% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 19 new homes completed houses · Apr 2025 – Oct 2026
Oct 2026 1.2 km away New homes 5 new homes completed houses · Jul 2026
Jul 2026 1.3 km away New homes 13 new homes completed 3 flats, 10 houses · Dec 2024 – Mar 2026
Mar 2026 1.3 km away New homes 12 new homes completed houses · Nov 2025 – Feb 2026
Feb 2026 1.5 km away New homes 6 new homes completed flats · Nov 2025
Dec 2025 1.4 km away New homes 10 new homes completed houses · Feb 2025
Mar 2025 1.2 km away New homes 14 new homes completed 1 flats, 13 houses · Oct 2024 – Mar 2025
Mar 2025 1.4 km away New homes 9 new homes completed houses · Oct 2024 – Feb 2025
Feb 2025 1.2 km away Planning permission Permission for 6 homes 31 Beach Road (full planning permission)
Jan 2024 450 m away Planning permission Nov 2022 1.9 km away Planning permission Sept 2022 1.7 km away 11 homes extended 2021–2025, typically adding 34 m²
27 since energy certificates began (2008)
0 in NE33 2DP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 24 storm overflows within 2 km
964 hours of spills in 2025 between them (typical neighbourhood: about 36)
356 spill events counted
Northumbrian Water Eldon Street Cso into River Tyne Estuarine Waters 50 spills, 176 hours in 2025
1.9 km away Northumbrian Water Tudor Road Cso into River Tyne Estuarine Waters 42 spills, 149 hours in 2025
900 m away Northumbrian Water Wapping Street Cso into River Tyne Estuarine Waters · near bathing water: Littlehaven Beach 58 spills, 147 hours in 2025
700 m away Northumbrian Water Temple Street Cso into River Tyne Estuarine Waters 42 spills, 112 hours in 2025
1.9 km away Northumbrian Water Coronation St Cso into River Tyne (Estuary) 19 spills, 112 hours in 2025
900 m away Northumbrian Water Harton Low Staithes Cso into Tyne Saline Estuary 24 spills, 73 hours in 2025
750 m away Northumbrian Water South Shields Pilot Sps into River Tyne (Tidal) · near bathing water: Littlehaven Beach 14 spills, 43 hours in 2025
800 m away Northumbrian Water Fish Quay Cso into Tyne Estuary · near bathing water: Littlehaven Beach 15 spills, 39 hours in 2025
1.1 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 50 planned, approved or being built and 6 running (80 MW between them). Those within 5 km are on the map above.
Rooftop solar Westoe Crown Primary School, Sea Winnings Way - Solar Panels Approved, not yet built · 200 kW
Nov 2025 800 m away Rooftop solar Dunes Amusement Arcade, Sea Road - Solar Panels Approved, not yet built · 150 kW
Mar 2026 900 m away Rooftop solar Border Control Post, Coble Dene - Solar Panels Approved, not yet built · 250 kW
Sept 2025 1.7 km away Rooftop solar Mortimer community college, Reading Road - Solar Panels Approved, not yet built · 320 kW
Nov 2025 2.0 km away Rooftop solar Merchant House Warehouse, Tyne Dock - Solar Photovoltaics Equipment Approved, not yet built · 690 kW
Nov 2023 2.8 km away Rooftop solar Middlefields Depot, Middlefields Industrial Estate - Solar Panels Approved, not yet built · 520 kW
Feb 2026 2.9 km away Battery storage Port Of Tyne, Tyne Dock - Battery Storage Planning application in
Jul 2022 3.0 km away Rooftop solar UTS Engineering, Pilgrimsway - Solar Panels Approved, not yet built
Oct 2025 3.3 km away Battery storage Hamar Close & Wallsend Road, High Flatworth - Battery Energy Storage Approved, not yet built
Sept 2024 3.3 km away Battery storage Standby Embedded Stor Power Plant - Battery storage Being built · 20 MW
Oct 2022 3.4 km away Road and street works within 1 km 23 permitted works running now or planned, 13 of them major.
Major, planned Ocean Road, South Shields Highway repair and maintenance works · SOUTH TYNESIDE COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 250 m away Major Ocean Road, South Shields Highway repair and maintenance works · SOUTH TYNESIDE COUNCIL · No carriageway incursion
Sept 2026 to Nov 2026 250 m away Major Rear Of George Scott Street And Lawe Road, South Shields Utility asset works · BT · Road closure
Oct 2026 to Oct 2026 300 m away Major Urfa Terrace, South Shields Highway repair and maintenance works · SOUTH TYNESIDE COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 350 m away Major Beach Road, South Shields Optional permit (no fee) e.g. for traffic management etc · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026 550 m away Major Newmarket Walk, South Shields Utility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Nov 2026 to Nov 2026 850 m away Major Derby Terrace, South Shields Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026 850 m away Major Westoe Road, South Shields Optional permit (no fee) e.g. for traffic management etc · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026 850 m away Major Maxwell Street, South Shields Utility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Major infrastructure projects within 30 km Decided decided Jan 2016 4.4 km away Decided decided Sept 2018 7.1 km away Decided decided Jul 2020 7.7 km away Decided decided Jan 2021 14.1 km away Decided decided Jul 2013 16.3 km away Decided decided Jan 2015 26.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Howdon STW (other, 800 m); Port of Tyne (battery storage, 3.0 km); Tynemouth Energy Storage System (TESS) (battery storage, 5.5 km); Nissan Test Track (solar farm, 9.2 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.